1.1 |
Date updated: |
Nov 28, 2023 |
1.2 |
Vessel's name (IMO number): |
Solar Ailene (9877664) |
1.3 |
Vessel's previous name(s) and date(s) of change: |
Not Applicable |
1.4 |
Date delivered / Builder (where built): |
Jan 15, 2021 / HYUNDAI MIPO DOCKYARD CO.LTD. ULSAN, SOUTH KOREA |
1.5 |
Flag / Port of Registry: |
Marshall Islands / Majuro |
1.6 |
Call sign / MMSI: |
V7A2677 / 538008708 |
1.7 |
Vessel's contact details (satcom/fax/email etc.): |
Tel: + 15052073843 / +85258030395 Fax: Email: master@solarailene.amosconnect.com |
1.8 |
Type of vessel (as described in Form A or Form B Q1.11 of the IOPPC): |
Other (Product tanker) |
1.9 |
Type of hull: |
Double Hull |
1.10 |
Registered owner - Full style: |
Solar Maritime Designated Activity Company Unit 3, 52-55 Sir John Rogerson's Quay, Dublin 2, D02NA07
Ireland Ireland Tel: + 353 16336032 / 6046 Email: solarmaritime@ocorian.com |
1.11 |
Technical operator - Full style: |
FLEET MANAGEMENT LIMITED 27/F South Island Place
8 Wong Chuk Hang Road
Hong Kong Tel: +852 2298 8300 Fax: +852 2528 1550 Email: fleet-hk-vetting@fleetship.com Company IMO#: 1601573 |
1.12 |
Commercial operator - Full style: |
SHELL INTERNATIONAL TRADING AND SHIPPING COMPANY LIMITED AS MANAGERS FOR AND ON BEHALF OF SHELL TANK Shell International Trading and Shipping Company Limited
20 York Road, London, United Kingdom, SE1 7NA
United Kingdom
Tel: +44 207 7977 7146
Email: FreightOperations@shell.com
United Kingdom Tel: +442079346027 Email: Leo.Diniz@shell.com |
1.13 |
Disponent owner - Full style: |
STSL Shell Tankers (Singapore) Private Limited The Metropolis Tower 1
9 North Buona Vista Drive, #07-01
Singapore
138588
|
1.14 |
P & I Club - Full Style: |
Assuranceforeningen GARD gjensidig,
UK Branch,
7 Bishopgate,
London EC2N 3AR
United Kingdom |
1.15 |
P & I Club pollution liability coverage / expiration date: |
1,000,000,000 US$ |
Feb 20, 2024 |
1.16 |
Hull & Machinery insured by - Full Style: (Specify broker or leading underwriter) |
Gallaghar Insurance The Walbrook building,
25 Walbrook,
London, EC4N 8AW
Email: paul_tingley@ajg.com Tel: +44 207 234 4720 |
1.17 |
Hull & Machinery insured value / expiration date: |
28,800,000 US$ |
May 09, 2024 |
1.18 |
Classification society: |
Lloyds Register |
1.19 |
Class notation: |
+100A1
Double Hull Oil and Chemical Tanker, Ship Type 2, CSR, ESP, ShipRight(CM, ACS(B)), *IWS, LI, SPM4,
ECO(SEEMP, BWT, TC, CRM, BIO, IBTS, VECS-L)
+LMC, IGS, UMS, BWTS
Descriptive Note: ETA, ShipRight(BWMP(S, T), SCM, IHM, SERS) |
1.20 |
Is the vessel subject to any conditions of class, class extensions, outstanding memorandums or class recommendations? If yes, give details: |
No
|
1.21 |
If classification society changed, name of previous and date of change: |
, Not Applicable |
1.22 |
Does the vessel have ice class? If yes, state what level: |
No, |
1.23 |
Date / place of last dry-dock: |
/ New Delivery |
1.24 |
Date next dry dock due / next annual survey due: |
Jan 14, 2026 |
Dec 26, 2023 |
1.25 |
Date of last special survey / next special survey due: |
|
Jan 14, 2026 |
1.26 |
If ship has Condition Assessment Program (CAP), what is the latest overall rating: |
No, |
1.27 |
Length overall (LOA): |
169.06 m |
1.28 |
Length between perpendiculars (LBP): |
161.46 m |
1.29 |
Extreme breadth (Beam): |
25.60 m |
1.30 |
Moulded depth: |
15.629 m |
1.31 |
Keel to masthead (KTM)/ Keel to masthead (KTM) in collapsed condition, if applicable: |
43.41 m |
m |
1.32 |
Distance bridge front to center of manifold: |
48.88 m |
1.33 |
Bow to center manifold (BCM) / Stern to center manifold (SCM): |
84.64 m |
84.42 m |
1.34 |
Parallel body distances: |
Lightship |
Normal Ballast |
Summer Dwt |
Forward to mid-point manifold: |
25.62 m |
36.89 m |
40.08 m |
Aft to mid-point manifold: |
23.65 m |
36.55 m |
48.55 m |
Parallel body length: |
49.27 m |
73.44 m |
88.66 m |
1.35 |
Net Tonnage: |
6,428.00 |
1.36 |
Gross Tonnage / Reduced Gross Tonnage (if applicable): |
17,915.00 |
14,123 |
1.37 |
Suez Canal Tonnage - Gross (SCGT) / Net (SCNT): |
19,135.38 |
15,680.64 |
1.38 |
Panama Canal Net Tonnage (PCNT): |
15,002.00 |
1.39 |
Loadline |
Freeboard |
Draft |
Deadweight |
Displacement |
Summer: |
5.613 m |
10.016 m |
25,039 MT |
32,415 MT |
Winter: |
5.821 m |
9.808 m |
24,252 MT |
31,628 MT |
Tropical: |
5.405 m |
10.224 m |
25,831 MT |
33,207 MT |
Lightship: |
12.769 m |
2.86 m |
|
7,376.00 MT |
Normal Ballast Condition: |
9.194 m |
6.435 m |
11,968.10 MT |
19,344.10 MT |
Segregated Ballast Condition: |
9.014 m |
6.615 m |
12,608.00 MT |
19,984.00 MT |
1.40 |
FWA/TPC at summer draft: |
213 mm |
37.96 MT |
1.41 |
Does vessel have multiple SDWT? If yes, please provide all assigned loadlines: |
Yes 25039 mt and 19999 mt |
1.42 |
Constant (excluding fresh water): |
150 MT |
1.43 |
What is the company guidelines for Under Keel Clearance (UKC) for this vessel? |
When in ocean and coastal passages outside shallow waters at least vessel's ''maximum static draft''
In shallow waters:
Minimum UKC amounting to 10% of ship's static draft or 1 meter or local/port requirement, whichever is greater.
At berth UKC requirement:
The greater of 1.5% of the ships extreme breadth or 0.3 meters or local/port requirement. |
1.44 |
What is the max height of mast above waterline (air draft) |
Full Mast |
Collapsed Mast |
Summer deadweight: |
33.394 m |
0 m |
Normal ballast: |
m |
0 m |
Lightship: |
40.55 m |
0 m |
|
2.1 |
Safety Equipment Certificate (SEC): |
Dec 28, 2021 |
Nov 23, 2023 |
Not Applicable |
Jan 14, 2026 |
2.2 |
Safety Radio Certificate (SRC) |
Jan 15, 2021 |
Nov 23, 2023 |
Not Applicable |
Jan 14, 2026 |
2.3 |
Safety Construction Certificate (SCC): |
Jan 15, 2021 |
Nov 23, 2023 |
Nov 23, 2023 |
Jan 14, 2026 |
2.4 |
International Loadline Certificate (ILC): |
Jan 15, 2021 |
Nov 23, 2023 |
Not Applicable |
Jan 14, 2026 |
2.5 |
International Oil Pollution Prevention Certificate (IOPPC): |
Nov 23, 2023 |
Nov 23, 2023 |
Nov 23, 2023 |
Jan 14, 2026 |
2.6 |
International Ship Security Certificate (ISSC): |
May 02, 2021 |
Not Applicable |
Jul 06, 2023 |
May 01, 2026 |
2.7 |
Maritime Labour Certificate (MLC): |
May 02, 2021 |
|
|
May 01, 2026 |
2.8 |
ISM Safety Management Certificate (SMC): |
May 02, 2021 |
Not Applicable |
Jul 06, 2023 |
May 01, 2026 |
2.9 |
Document of Compliance (DOC): |
Apr 15, 2021 |
Apr 28, 2023 |
|
May 19, 2025 |
2.10 |
USCG Certificate of Compliance (USCGCOC): |
Aug 28, 2022 |
Aug 28, 2022 |
Not Applicable |
Aug 28, 2024 |
2.11 |
Civil Liability Convention (CLC) 1992 Certificate: |
Feb 01, 2023 |
|
|
Feb 20, 2024 |
2.12 |
Civil Liability for Bunker Oil Pollution Damage Convention (CLBC) Certificate: |
Feb 01, 2023 |
|
|
Feb 20, 2024 |
2.13 |
Liability for the Removal of Wrecks Certificate (WRC): |
Feb 01, 2023 |
|
|
Feb 20, 2024 |
2.14 |
U.S. Certificate of Financial Responsibility (COFR): |
Jan 27, 2021 |
|
|
Jan 27, 2024 |
2.15 |
Certificate of Class (COC): |
Jan 15, 2021 |
Nov 23, 2023 |
Nov 23, 2023 |
Jan 14, 2026 |
2.16 |
International Sewage Pollution Prevention Certificate (ISPPC): |
Jan 15, 2021 |
|
|
Jan 14, 2026 |
2.17 |
Certificate of Fitness (COF): |
Jan 15, 2021 |
Nov 23, 2023 |
Nov 23, 2023 |
Jan 14, 2026 |
2.18 |
International Energy Efficiency Certificate (IEEC): |
Nov 23, 2023 |
|
|
|
2.19 |
International Air Pollution Prevention Certificate (IAPPC): |
Nov 23, 2023 |
Nov 23, 2023 |
Nov 23, 2023 |
Jan 14, 2026 |
2.20 |
Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: |
Yes |
2.21 |
Does vessel have in place a Drug and Alcohol Policy complying with OCIMF guidelines for Control of Drugs and Alcohol Onboard Ship? |
Yes |
2.22 |
Is the ITF Special Agreement on board (if applicable)? |
Yes |
2.23 |
ITF Blue Card expiry date (if applicable): |
Feb 20, 2024 |
|
3.1 |
Nationality of Master: |
Turkish |
3.2 |
Number and nationality of Officers: |
9 |
Turkish, Indian and Romanian |
3.3 |
Number and nationality of Crew: |
11 |
Indian |
3.4 |
What is the common working language onboard: |
English |
3.5 |
Do officers speak and understand English: |
Yes |
3.6 |
If Officers/Crew employed by a Manning Agency - Full style: |
Officers: Fleet Management Limited 27/F, South Island Place, 8 Wong Chuk Hang
Road, Hongkong Tel: +852 2298 8300 Fax: +852 2528 1550 Email: Fleet-HK-Vetting@fleetship.com
Crew: Same as Officers Same as Officers |
|
4.1 |
Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter? |
Yes |
4.2 |
Qualified individual (QI) - Full style: |
Witt O'Brien's 818 Town and Country Blvd., Suite 200 Houston, TX 77024, USA Tel: +1-281-606-4818 // Alternate : +1-985-781-0804 Email: commandcenter@wittobriens.com |
4.3 |
Oil Spill Response Organization (OSRO) - Full style: |
National Response Corporation (NRC) 3500 Sunrise Highway, Building 200, Suite 200 Great River, New York 11739, USA Tel: +1-877-880-4672 (Within US) / +1-631-224-9141 EXT. 0 (Intern Fax: +1-631-224-9086 Email: iocdo@nrcc.com |
4.4 |
Salvage and Marine Firefighting Services (SMFF) - Full Style: |
DONJON - SMIT, LLC 15402 Vantage Parkway East, Suite 316 Houston, Texas 77032 Tel: +1 (703) 299-0081 24 Hour Fax: +1 (703) 299-0085 Email: admin@donjon-smit.com |
|
5.1 |
Is the vessel operated under a Quality Management System? If Yes, what type of system? (ISO9001 or IMO Resolution A.741(18) as amended): |
Yes IMO Resolution A.741 (18) |
5.2 |
Can the ship comply with the ICS Helicopter Guidelines? |
Yes |
5.2.1 |
If Yes, state whether winching or landing area provided: |
Winching |
5.2.2 |
If Yes, what is the diameter of the circle provided: |
5.00 m |
|
6.1 |
Tank Coating |
Coated |
Type |
To What Extent |
Anodes |
Cargo tanks: |
Yes |
Interline 9001 |
100% |
No |
Ballast tanks: |
Yes |
Epoxy |
Full Tank |
Yes |
Slop tanks: |
Yes |
Interline 9001 |
Whole Tank |
No |
|
7.1 |
Pumps: |
No. |
Type |
Capacity |
At What Head (sg=1.0) |
Ballast Pumps: |
2 |
Centrifugal |
500 m3/hr |
30 m |
Ballast Eductors: |
|
|
m3/hr |
m |
|
8.1 |
Is vessel fitted with centerline bulkhead in all cargo tanks? If Yes, solid or perforated: |
Yes, Solid |
8.2 |
Number of cargo tanks and total cubic capacity (98%): |
12 |
28,768.60 m3 |
8.2.1 |
Capacity (98%) of each natural segregation with double valve (specify tanks): |
1P- 1492.246 m3 1S- 1500.772 m3 2P- 2483.418 m3 2S- 2496.354 m3 3P- 2667.560 m3 3S- 2675.988 m3 4P- 2671.774 m3 4S- 2680.202 m3 5P- 2666.188 m3 5S- 2674.616 m3 6P- 2378.362 m3 6S- 2381.106 m3 Slop tanks are with double valve segregation SL(P)- 455.504 m3, SL(S)-446.488 m3 (Total - 14 Nos of segregation including Slops) |
8.2.2 |
IMO class (Oil/Chemical Ship Type 1, 2 or 3): |
IMO 2 |
8.3 |
Number of slop tanks and total cubic capacity (98%): |
2 |
901.992 m3 |
8.3.1 |
Specify segregations which slops tanks belong to and their capacity with double valve: |
Each Slop can be segregated from one another and rest of tanks.
SL(P)- 455.504 m3, SL(S)-446.488 m3 |
8.3.2 |
Residual/Retention oil tank(s) capacity (98%), if applicable: |
61.544 m3 |
8.3.3 |
What is total SBT capacity and percentage of SDWT vessel can maintain? |
12,826.50 m3 |
51.30 % |
8.3.4 |
Does vessel meet the requirements of MARPOL Annex I Reg 18.2: |
Yes |
8.4 |
How many grades/products can vessel load/discharge with double valve segregation: |
14 |
8.4.1 |
State type of cargo containment (integral, independent, gravity or pressure tanks): |
2G (Integral Gravity) |
8.5 |
Are there any cargo tank filling restrictions? If yes, specify number of slack tanks, max s.g., ullage restrictions etc.: |
Yes 100% SG of 1.025 |
8.6 |
Max loading rate for homogenous cargo |
With VECS |
Without VECS |
Loaded per manifold connection: |
375 m3/hr |
375 m3/hr |
Loaded simultaneously through all manifolds: |
2,250 m3/hr |
2,250.00 m3/hr |
8.7 |
Is ship fitted with a Cargo Control Room (CCR): |
Yes |
8.8 |
Can tank innage / ullage be read from the CCR: |
Yes |
8.9 |
Is gauging system certified and calibrated? If no, specify which ones are not calibrated: |
Yes, |
|
What type of gauging system as per IBC 13.1 is fitted (Open/Restricted/Closed)? |
closed |
|
What type of fixed closed tank gauging system is fitted: |
Radar Type |
|
Is a tank overflow control system fitted? If yes, then state if system includes automatic closing of valves?: |
Yes, No |
|
Are overfill (high) alarms fitted? If Yes, indicate whether to all tanks or partial: |
Yes, |
8.9.1 |
Can cargo be transferred under closed loading conditions in accordance with ISGOTT 11.1.6.6? |
Yes |
8.9.2 |
Are cargo tanks fitted with multipoint gauging? If yes, specify type and locations: |
No, |
8.10 |
Number of portable gauging units (example- MMC) on board: |
3 |
8.11 |
Is a Vapour Emission Control System (VECS) fitted? |
Yes |
8.12 |
Number/size of VECS manifolds (per side): |
2 |
250 mm |
8.13 |
Number / size / type of VECS reducers: |
4 Nos, 10" x 10", ANSI |
8.14 |
State what type of venting system is fitted: |
P/V Valve |
8.15 |
Total number / size of cargo manifold connections on each side: |
14 / 150.00 mm |
8.15.1 |
Does the vessel have a Common Line Manifold connection? If yes, describe: |
14/150.00 Millimetres (14= (12 x 150 mm + 2 x 100 mm))//
(Slop P and Slop S: 100mm
1W~6W: 150mm
Common: 300mm) (Cargo Manifold Reducers S/S 6x6-24, 6x8-6, 6x10-6, 6x12-6, 4x4-4, 4x6-2, 4x8-1, 4x10-1, 4x12-1, 12x10-1, 12x12-1, 12x16-1. Vapor Line Reducers S/S- 10x10-4, 10x8-1. Y-type Connectors S/S 6x6x6-3, 4x4x4-1. U-Type Connectors S/S 6x6-6, 4x4-2, 10x10-1. Bunker Manifold Reducers-M/S 4x4-2, 6x6-4, 6x8-1, 6x10-1.) |
8.16 |
What type of valves are fitted at manifold: |
Butterfly |
8.17 |
What is the material/rating of the manifold: |
SUS316 / ANSI 150 PSI |
8.17.1 |
Does vessel comply with the latest edition of the OCIMF 'Recommendations for Oil Tanker Manifolds and Associated Equipment'? |
Yes |
8.18 |
Distance between cargo manifold centers: |
2,000.00 mm |
8.19 |
Distance ships rail to manifold: |
4,600.00 mm |
8.20 |
Distance manifold to ships side: |
4,600.00 mm |
8.21 |
Top of rail to center of manifold: |
700.00 mm |
8.22 |
Distance main deck to center of manifold: |
2,100.00 mm |
8.23 |
Spill tank grating to center of manifold: |
900.00 mm |
8.24 |
Manifold height above the waterline in normal ballast / at SDWT condition: |
11.294 m |
7.713 m |
8.25 |
Number / size / type of reducers: |
6 x 150/300mm (6/12") 6 x 150/250mm (6/10") 6 x 150/200mm (6/8") 1 x 150/100mm (6/4") 1 x 100/300mm (4/12") ((1 x 100/250mm (4/10")
1 x 100/200 mm (4/8")
1 x 250/300mm (10/12”)
1 x 300/350mm (12/16”)
----------------------------------
CY1 type: 3 x 150mm x 150 mm x 150 mm
SY1 type: 1 x 100mm x 100mm x 100mm
CU1 type: 3 x 150mm x 150mm
CU2 type: 2 x 100mm x 100mm
SU1 type: 1 x 250mm x 250mm)
) ANSI |
8.26 |
Is vessel fitted with a stern manifold? If yes, state size: |
No, mm |
8.27 |
Cargo / slop tanks fitted with a cargo heating system? |
Type |
Coiled |
Material |
Cargo Tanks |
Individual tank Heat Exchanger (1W-6W) |
No (Slop P & Slop S are provided with Steam heating coils of material Stainless Steel.) |
SS |
Slop Tanks: |
Steam Heating Coils |
Yes |
SS |
8.27.1 |
Is a Thermal Oil Heating system fitted? If yes, identify tanks?: |
No, |
8.28 |
Maximum temperature cargo can be loaded / maintained: |
70.0 °C / 158.0 °F |
60 °C / 140 °F |
8.28.1 |
Minimum temperature cargo can be loaded / maintained: |
|
|
8.29 |
Is an Inert Gas System (IGS) fitted / operational? |
Yes / Yes |
8.29.1 |
Is a Crude Oil Washing (COW) installation fitted / operational? |
No / N/A |
8.30 |
Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen: |
Nitrogen Generator |
8.30.1 |
If nitrogen generator, specify the applicable flow rate for each of the designed purity modes: |
2850 cu.m / hr (95% purity) |
8.31 |
How many cargo pumps can be run simultaneously at full capacity: |
6 |
8.32 |
Pumps: |
No. |
Type |
Capacity |
At What Head (sg=1.0) |
Cargo Pumps: |
12 2 |
Centrifugal Centrifugal |
375 M3/HR 150 M3/HR |
120 Meters 120 Meters |
Cargo Eductors: |
|
|
m3/hr |
m |
Stripping: |
|
|
m3/hr |
m |
8.33 |
Is at least one emergency portable cargo pump provided? |
Yes |
8.34 |
Is tank cleaning equipment fixed in cargo tanks? |
Yes |
8.35 |
Is portable tank cleaning equipment provided? |
Yes |
8.36 |
Tank washing pump capacity: |
100.00 m3/hr |
8.37 |
Is a washing water heater fitted? If yes is it operational and state max washing water temperature: |
Yes, Yes 80.00 °C |
8.38 |
What is the maximum number of machines that can be operated at their designed max pressure? |
4 |
8.39 |
Is vessel fitted with a remote cargo tank temperature monitoring system. If yes, is it operational? |
Yes, Yes |
8.40 |
Is vessel fitted with a remote cargo tank pressure monitoring system. If yes, is it operational? |
Yes, Yes |
8.41 |
Is vessel fitted with a cargo tank drier. If yes is it operational and state capacity: |
No, N/A, m3/hr |
8.42 |
Is vessel fitted with a cargo cooling system. If yes is it operational and state tanks applicable: |
No, N/A, |
8.43 |
Is steam available on deck? |
Yes |
|
9.1 |
Wires (on drums) |
No. |
Diameter |
Material |
Length |
Breaking Strength |
Forecastle: |
|
mm |
|
m |
MT |
Main deck fwd: |
|
mm |
|
m |
MT |
Main deck aft: |
|
mm |
|
m |
MT |
Poop deck: |
|
mm |
|
m |
MT |
9.2 |
Wire tails |
No. |
Diameter |
Material |
Length |
Breaking Strength |
Forecastle: |
4 |
55.00 mm |
EUROFLEX MOORING TAIL 8 STRANDS PLAITED |
11.00 m |
72.80 MT |
Main deck fwd: |
2 |
55.00 mm |
EUROFLEX MOORING TAIL 8 STRANDS PLAITED |
11.00 m |
72.80 MT |
Main deck aft: |
2 |
55.00 mm |
EUROFLEX MOORING TAIL 8 STRANDS PLAITED |
11.00 m |
72.80 MT |
Poop deck: |
4 |
55.00 mm |
EUROFLEX MOORING TAIL 8 STRANDS PLAITED |
11.00 m |
72.80 MT |
9.3 |
Ropes (on drums) |
No. |
Diameter |
Material |
Length |
Breaking Strength |
Forecastle: |
4 |
27.00 mm |
HMPE |
200.00 m |
60.00 MT |
Main deck fwd: |
2 |
27.00 mm |
HMPE |
200.00 m |
60.00 MT |
Main deck aft: |
2 |
27.00 mm |
HMPE |
200.00 m |
60.00 MT |
Poop deck: |
4 |
27.00 mm |
HMPE |
200.00 m |
60.00 MT |
9.4 |
Other lines |
No. |
Diameter |
Material |
Length |
Breaking Strength |
Forecastle: |
1 |
56.00 mm |
ENDUWINFLEX ROPE 12 STRANDS (70% PP & 30% PES MIXED |
200.00 m |
61.20 MT |
Main deck fwd: |
1 |
56.00 mm |
ENDUWINFLEX ROPE 12 STRANDS (70% PP & 30% PES MIXED |
200.00 m |
61.20 MT |
Main deck aft: |
1 |
56.00 mm |
ENDUWINFLEX ROPE 12 STRANDS (70% PP & 30% PES MIXED |
200.00 m |
61.20 MT |
Poop deck: |
1 |
56.00 mm |
ENDUWINFLEX ROPE 12 STRANDS (70% PP & 30% PES MIXED |
200.00 m |
61.20 MT |
9.5 |
Winches |
No. |
No. Drums |
Motive Power |
Brake Capacity |
Type of Brake |
Forecastle: |
4 |
Double Drums |
Hydraulic |
46.40 MT |
Manual |
Main deck fwd: |
2 |
Double Drums |
Hydraulic |
46.40 MT |
Manual |
Main deck aft: |
2 |
Double Drums |
Hydraulic |
46.40 MT |
Manual |
Poop deck: |
4 |
Double Drums |
Hydraulic |
46.40 MT |
Manual |
9.6 |
Bitts, closed chocks/fairleads |
No. Bitts |
SWL Bitts |
No. Closed Chocks |
SWL Closed Chocks |
Forecastle: |
4 |
58 MT |
6 |
58 MT |
Main deck fwd: |
4 |
58 MT (2 Bitts - 58T and 2 Bitts - 46T) |
6 |
58 MT ( (4 Closed Chocks - 58T and 2 Closed Chocks - 46T)) |
Main deck aft: |
4 |
58 MT (2 Bitts - 58T and 2 Bitts - 46T) |
6 |
58 MT ( (4 Closed Chocks - 58T and 2 Closed Chocks - 46T)) |
Poop deck: |
4 |
58 MT |
10 |
58 MT |
9.7 |
Number of shackles on port / starboard cable: |
11 / 11 |
9.8 |
Type / SWL of Emergency Towing system forward: |
2000 kn type KETSP-20A |
2,000 MT |
9.9 |
Type / SWL of Emergency Towing system aft: |
1000kN type KETA-45F |
1,000 MT |
9.10.1 |
What is size of closed chock and/or fairleads of enclosed type on stern: |
1160mm X 504mm X1130mm |
9.10.2 |
What is SWL of closed chock and/or fairleads of enclosed type on stern: |
102.00 MT |
9.11 |
What is SWL of bollard on poop deck suitable for escort tug: |
58.00 MT |
9.12 |
Derrick / Crane description (Number, SWL and location): |
Cranes: 1 x 10.00 Tonnes Midship |
9.13 |
Accommodation ladder direction: |
Aft |
|
Does vessel have a portable gangway? If yes, state length: |
Yes |
10 m |
9.14 |
Does the vessel meet the recommendations in the latest edition of OCIMF 'Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings (SPM)'? |
Yes |
9.15 |
If fitted, how many chain stoppers: |
1 |
9.16 |
State type / SWL of chain stopper(s): |
Tounge Type |
204.00 MT |
9.17 |
What is the maximum size chain diameter the bow stopper(s) can handle: |
76.00 mm |
9.18 |
Distance between the bow fairlead and chain stopper/bracket: |
1.40 m |
9.19 |
Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: |
Yes
|
|
10.1 |
Speed |
Maximum |
Economical |
Ballast speed: |
14.96 Kts (WSNP) |
12.50 Kts (WSNP) |
Laden speed: |
14.72 Kts (WSNP) |
12.50 Kts (WSNP) |
10.2 |
What type of fuel is used for main propulsion / generating plant: |
|
LSMGO, VLSFO |
10.3 |
Type / Capacity of bunker tanks: |
Fuel Oil: 1,098.60 m3 Diesel Oil: m3 Gas Oil: 280 m3 |
10.4 |
Is vessel fitted with fixed or controllable pitch propeller(s): |
Fixed |
10.5 |
Engines |
No |
Capacity |
Make/Type |
Main engine: |
1 |
7,000 Kw |
HYUNDAI-MAN B&W 6S46ME-B8.5-HPSCR |
Aux engine: |
3 |
1,120 Kw |
HYUNDAI HIMSEN,6H21/32,Four stroke,Trunk Piston,In |
Power packs: |
|
m3/hr |
|
Boilers: |
2 |
18.00 MT/Hr |
AALBORG OL,Automatic, Vertical forced draft, |
10.6 |
What is brake horse power of bow thruster (if fitted): |
No, bhp |
10.7 |
What is brake horse power of stern thruster (if fitted): |
No, bhp |
10.8 |
Main engine IMO NOx emission standard: |
Tier III |
10.9 |
Energy Efficiency Design Index (EEDI) rating number: |
7.83 |
|
11.1 |
Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum, Chemicals or Liquified Gas, as applicable)? |
Yes |
11.2 |
What is maximum outreach of cranes / derricks outboard of the ship's side: |
7.00 m |
11.3 |
Date/place of last STS operation: |
06-May-2022 / Augusta, Italy |
|
12.1 |
Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last): |
|
12.2 |
Has vessel been involved in a pollution, grounding, serious casualty or collision incident during the past 12 months? If yes, full description: |
Pollution: No, Grounding: No, Casualty: No, Repair: No, Collision: No, |
12.3 |
Date and place of last Port State Control inspection: |
Nov 04, 2023 / Rotterdam, Netherlands |
12.4 |
Any outstanding deficiencies as reported by any Port State Control? If yes, provide details: |
No
|
12.5 |
Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:
*"Approvals" are not given by Oil Majors and ships are accepted for the voyage on a case by case basis. |
Contact owner for details. |
12.6 |
Date / place of last SIRE inspection: |
Nov 05, 2023 / Netherlands Rotterdam [NLRTM] |
12.6.1 |
Date / place of last CDI inspection: |
Jan 14, 2023 / Manaus |
12.7 |
Additional information relating to features of the ship or operational characteristics: |
|