1.1 |
Date updated: |
Nov 07, 2024 |
1.2 |
Vessel's name (IMO number): |
Solar Nesrin (9877626) |
1.2b |
Is the vessel owner/manager a member of INTERTANKO? If yes, please provide IMO number of the Member organization |
, |
1.3 |
Vessel's previous name(s) and date(s) of change: |
Not Applicable |
1.4 |
Date delivered / Builder (where built): |
Jun 30, 2020 / HYUNDAI MIPO DOCKYARD CO.LTD. ULSAN,SOUTH KOREA |
1.5 |
Flag / Port of Registry: |
Marshall Islands / Majuro |
1.6 |
Call sign / MMSI: |
V7A2673 / 538008704 |
1.7 |
Vessel's contact details (satcom/fax/email etc.): |
Tel: +1(505)814-1498 |
Fax: +870 786 884 918 |
Email: master@solarnesrin.amosconnect.com |
1.8 |
Type of vessel (as described in Form A or Form B Q1.11 of the IOPPC): |
Oil Tanker (Product Tanker) |
1.8a |
If other type of vessel, please specify: |
|
1.9 |
Type of hull: |
Double Hull |
1.10 |
Registered owner - Full style: IMO Number |
Solar Maritime Designated Company Unit 3, 52-55 Sir John Rogerson's Quay, Dublin 2, D02NA07
Ireland Ireland Tel: + 353 16336032 / 6046 Email: solarmaritime@ocorian.com IMO: |
1.11 |
Technical operator - Full style: |
Fleet Management Limited FLEET MANAGEMENT LIMITED
27/F South Island Place
8 Wong Chuk Hang Road
Company IMO#: 1601573 Hong Kong Tel: +852 2298 8300 Fax: +852 2528 1550 Email: fleet-hk-vetting@fleetship.com Web: www.fleetship.com Company IMO#: 1601573 |
1.12 |
Commercial operator - Full style: |
Shell Trading (US) Company Shell Trading (US) Company
1000 Main St. 12th Floor Houston, TX 77002 United States Tel: +1 281 236 7674
Tel: +1 346 799 2553
Email: STUSCO-Freight-Ops@shell.com
Web: www.Shell.com
Dennis Fewell
+1 281 236 7674 United States Tel: +1 346 799 2553 Email: Dennis Fewell |
1.13 |
Disponent owner - Full style: |
Shell Tankers (Singapore) Private Ltd Shell Tankers (Singapore) Private Ltd
The Metropolis Tower 1,
9 North Buona Vista Drive, Singapore 138588
Sietco Business Registration No 44480800X
Tel: +65 6215 1163
Email: GXSIETCOFreightOperations@shell.com
Tel: Tel: +65 6215 1163 Email: FreightOperations@shell.com |
1.14 |
P & I Club - Full Style: |
Gard P&I (Bermuda) Ltd. Assuranceforeningen GARD gjensidig,
UK Branch,
7 Bishopgate,
London EC2N 3AR
United Kingdom Tel: +47 90 52 41 00 Email: MLC@gard.no |
1.15 |
P & I Club pollution liability coverage / expiration date: |
1,000,000,000 US$ |
Feb 20, 2025 |
1.16 |
Hull & Machinery insured by - Full Style: (Specify broker or leading underwriter) |
Gallagher Insurance The Walbrook building,
25 Walbrook,
London, EC4N 8AW Tel: +44 2072344750 Fax: paul_tingley@ajg.com |
1.17 |
Hull & Machinery insured value / expiration date: |
28,800,000 US$ |
May 08, 2025 |
1.18 |
Classification society: |
American Bureau of Shipping |
1.18a |
Is Classification Society an IACS member? |
Yes |
1.19 |
Class notation: |
*100A1, Double Hull Oil and Chemical Tanker, Ship Type 2, CSR, ESP, ShipRight(CM, ACS(B)),*IWS, LI, SPM4, ECO(SEEMP, BWT, TC, CRM, BIO, IBTS, VECS-L)*LMC, IGS, UMS, BWTS Descriptive note : ETA, ShipRight (BWMP(S,T), SCM, IHM, SERS) |
1.20 |
Does the vessel have any open conditions of Class?? If yes List all open conditions: |
No
|
1.20a |
Does the vessel have any Memoranda of Class? If yes, list details: |
No
|
1.21 |
If classification society changed, name of previous and date of change: |
Lloyds Register, Dec 16, 2023 |
1.22 |
Does the vessel have ice class? If yes, state what level: |
No, |
1.23 |
Date / place of last dry-dock: |
Not Applicable / New Delivery |
1.24 |
Date next dry dock due / next annual survey due: |
Jun 29, 2025 |
|
1.25 |
Date of last special survey / next special survey due: |
Jun 30, 2020 |
Jun 29, 2025 |
1.26 |
If ship has Condition Assessment Program (CAP), what is the latest overall rating: |
No, |
1.27 |
Length overall (LOA): |
169.06 m |
1.28 |
Length between perpendiculars (LBP): |
161.46 m |
1.29 |
Extreme breadth (Beam): |
25.60 m |
1.30 |
Moulded depth: |
15.60 m |
1.31 |
Keel to masthead (KTM) / Keel to masthead (KTM) in collapsed condition, if applicable: |
43.41 m |
m |
1.32 |
Distance bridge front to center of manifold: |
48.88 m |
1.33 |
Bow to center manifold (BCM) / Stern to center manifold (SCM): |
84.64 m |
84.42 m |
1.34 |
Parallel body distances: |
Lightship |
Normal Ballast |
Summer Dwt |
Forward to mid-point manifold: |
25.62 m |
36.89 m |
40.08 m |
Aft to mid-point manifold: |
23.65 m |
36.55 m |
48.58 m |
Parallel body length: |
49.27 m |
73.44 m |
88.64 m |
1.35 |
Net Tonnage: |
6,428.00 |
1.36 |
Gross Tonnage / Reduced Gross Tonnage (if applicable): |
17,915.00 |
14,123 |
1.37 |
Suez Canal Tonnage - Gross (SCGT) / Net (SCNT): |
19,135.38 |
15,680.64 |
1.38 |
Is vessel fitted for transit of Panama Canal? Panama Canal Net Tonnage (PCNT): |
, 15,002.00 |
1.39 |
Loadline |
Freeboard |
Draft |
Deadweight |
Displacement |
Summer: |
5.61 m |
10.02 m |
25,039.00 MT |
32,415.00 MT |
Winter: |
5.82 m |
9.81 m |
24,252.00 MT |
31,628.00 MT |
Tropical: |
5.41 m |
10.22 m |
25,831.00 MT |
33,207.00 MT |
Normal loaded condition: |
5.61 m |
10.02 m |
25,039.00 MT |
32,415.00 MT |
Lightship: |
12.77 m |
2.86 m |
Not Applicable |
7,340.00 MT |
Normal Ballast Condition: |
9.19 m |
6.44 m |
11,968.10 MT |
19,334.10 MT |
Segregated Ballast Condition: |
9.01 m |
6.62 m |
12,608.00 MT |
19,984.00 MT |
1.40 |
FWA/TPC at summer draft: |
213.00 mm |
37.96 MT |
1.41 |
Have multiple deadweights been assigned? If yes, list all assigned deadweights: |
Yes Assigned DWT 1: 19,999.00 Assigned DWT 2: 25,039.00 Assigned DWT 3: Assigned DWT 4: Assigned DWT 5: |
1.42 |
Constant (excluding fresh water): |
150 MT |
1.43 |
What is the company guidelines for Under Keel Clearance (UKC) for this vessel? |
When in ocean and coastal passages outside shallow waters at least vessel's ''maximum static draft''
In shallow waters:
Minimum UKC amounting to 10% of ship's static draft or 1 meter or local/port requirement, whichever is greater.
At berth UKC requirement:
The greater of 1.5% of the ships extreme breadth or 0.3 meters or local/port requirement. |
1.44 |
What is the max height of mast above waterline (air draft) |
Full Mast |
Collapsed Mast |
Summer deadweight: |
33.394 m |
0 m |
Normal ballast: |
36.97 m |
0 m |
Lightship: |
40.55 m |
0 m |
|
2.1 |
Safety Equipment Certificate (SEC): |
Dec 16, 2023 |
Jul 18, 2024 |
|
Jun 29, 2025 |
2.2 |
Safety Radio Certificate (SRC): |
Dec 16, 2023 |
Jun 28, 2024 |
|
Jun 29, 2025 |
2.3 |
Safety Construction Certificate (SCC): |
Dec 16, 2023 |
Jun 28, 2024 |
|
Jun 29, 2025 |
2.4 |
International Loadline Certificate (ILC): |
Dec 16, 2023 |
Jun 28, 2024 |
|
Jun 29, 2025 |
2.5 |
International Oil Pollution Prevention Certificate (IOPPC): |
Dec 16, 2023 |
Jun 28, 2024 |
May 25, 2023 |
Jun 29, 2025 |
2.6 |
International Ship Security Certificate (ISSC): |
Dec 20, 2023 |
Not Applicable |
Not Applicable |
Dec 19, 2028 |
2.7 |
Maritime Labour Certificate (MLC): |
Dec 20, 2023 |
Not Applicable |
|
Dec 19, 2028 |
2.8 |
Minimum Safe Manning Certificate (MSM): |
Jun 30, 2020 |
Not Applicable |
Not Applicable |
Not Applicable |
2.9 |
ISM Safety Management Certificate (SMC): |
Dec 20, 2023 |
Not Applicable |
Not Applicable |
Dec 19, 2028 |
2.10 |
Document of Compliance (DOC): |
Apr 15, 2021 |
Jul 11, 2024 |
|
May 19, 2025 |
2.11 |
USCG Certificate of Compliance (USCGCOC): |
Oct 16, 2023 |
Not Applicable |
Not Applicable |
Oct 16, 2025 |
2.12 |
Civil Liability Convention (CLC) 1992 Certificate: |
Jan 16, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.13 |
Civil Liability for Bunker Oil Pollution Damage Convention (CLBC) Certificate: |
Jan 16, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.14 |
Liability for the Removal of Wrecks Certificate (WRC): |
Jan 16, 2024 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.15 |
U.S. Certificate of Financial Responsibility (COFR): |
Jun 30, 2023 |
Not Applicable |
Not Applicable |
Jun 30, 2026 |
2.16 |
Certificate of Class (COC): |
Mar 21, 2024 |
Jun 28, 2024 |
Not Applicable |
Jun 29, 2025 |
2.17 |
Certificate of Registry (COR): |
May 27, 2024 |
Not Applicable |
Not Applicable |
Not Applicable |
2.18 |
International Sewage Pollution Prevention Certificate (ISPPC) |
Dec 16, 2023 |
Not Applicable |
Not Applicable |
Jun 29, 2025 |
2.19 |
Certificate of Fitness (COF): |
Dec 16, 2023 |
Jun 28, 2024 |
|
Jun 29, 2025 |
2.20 |
International Energy Efficiency Certificate (IEEC): |
Dec 16, 2023 |
Not Applicable |
Not Applicable |
Not Applicable |
2.21 |
International Air Pollution Prevention Certificate (IAPPC): |
Dec 16, 2023 |
Jun 28, 2024 |
|
Jun 29, 2025 |
2.22 |
Ship Sanitation Control (SSCC)/Ship Sanitation Control Exemption (SSCE): |
Aug 26, 2024 |
Not Applicable |
Not Applicable |
Feb 25, 2025 |
2.23 |
Does the vessel have an International Ballast Water Management Certificate? If no, then describe how ship complies with the "International Convention for the Control and Management of Ships' Ballast Water and Sediments"?: |
Yes, |
2.24 |
Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: |
Yes |
2.25 |
Does vessel have in place a Drug and Alcohol Policy complying with OCIMF guidelines for Control of Drugs and Alcohol Onboard Ship? |
Yes |
2.26 |
Is the ITF Special Agreement on board (if applicable)? |
Yes |
2.27 |
ITF Blue Card expiry date (if applicable): |
Aug 16, 2026 |
|
3.1 |
Nationality of Master: |
Indian |
3.2 |
Number and nationality of Officers: |
9 |
Indian & Ukrainian |
3.3 |
Number and nationality of Crew: |
Nationality | Count |
---|
Philippines | 7 | India | 4 |
|
3.4 |
What is the common working language onboard: |
English |
3.5 |
Do officers speak and understand English? |
Yes |
3.6 |
If Officers/ratings employed by a Manning Agency - Full style: |
Officers:
Company Name | Address | Phone | Fax | Email |
---|
FLEE MANAGEMENT LIMITED | 27/F, South Island Place, 8 Wong Chuk Hang Road, Hongkong | +852 2298 8300 | +852 2528 1550 | Fleet-HK-Vetting@fleetship,com |
Ratings:
|
|
4.1 |
Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter? |
Yes |
4.2 |
Qualified individual (QI) - Full style: |
Witt O'Brien's 818 Town and Country Blvd., Suite 200 Houston, TX 77024, USA Tel: +1-281-606-4818 // Alternate : +1-985-781-0804 Email: commandcenter@wittobriens.com |
4.3 |
Oil Spill Response Organization (OSRO) - Full style: |
National Response Corporation (NRC) 3500 Sunrise Highway, Building 200, Suite 200 Great River, New York 11739, USA Tel: +1-877-880-4672 (Within US) / +1-631-224-9141 EXT. 0 (Intern Fax: +1-631-224-9086 Email: iocdo@nrcc.com |
4.4 |
Salvage and Marine Firefighting Services (SMFF) - Full Style: |
DONJON - SMIT, LLC 15402 Vantage Parkway East, Suite 316 Houston, Texas 77032 Tel: +1 (703) 299-0081 24 Hour Fax: +1 (703) 299-0085 Email: admin@donjon-smit.com |
|
5.1 |
Is the vessel operated under a Quality Management System? If Yes, what type of system? (ISO9001 or IMO Resolution A.741(18) as amended): |
Yes IMO Resolution A.741 (18) |
5.2 |
Can the ship comply with the ICS Helicopter Guidelines? |
Yes |
5.2.1 |
If Yes, state whether winching or landing area provided: |
Winch only |
5.2.2 |
If Yes, what is the diameter of the circle provided: |
5.00 m |
|
6.1 |
Cargo tanks:
Tank ID | Tank PSC | Tank Type | Constr | Coated Y/N | Coating Type | Extent | Condition | Date | Insp date | Insp Freq |
---|
1 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Aug 24, 2024 | Biannual | 1 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Aug 24, 2024 | Biannual | 2 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Aug 23, 2024 | Biannual | 2 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Aug 23, 2024 | Biannual | 3 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Aug 24, 2024 | Biannual | 3 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Aug 24, 2024 | Biannual | 4 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Aug 23, 2024 | Biannual | 4 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Aug 23, 2024 | Biannual | 5 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Aug 24, 2024 | Biannual | 5 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Aug 24, 2024 | Biannual | 6 | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Aug 23, 2024 | Biannual | 6 | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Aug 23, 2024 | Biannual | SLOP | P | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Aug 31, 2024 | Biannual | SLOP | S | 2g | Mild Steel | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Aug 24, 2024 | Biannual |
Anodes Fitted: No |
Ballast tanks:
ID | Coated? | Type | Extent | Condition | Coating date | Insp date | Insp freq |
---|
FPK | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Jan 22, 2024 | Annual | 1W,2W,3W | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Mar 05, 2024 | Annual | 4P | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Apr 24, 2024 | Annual | 4S | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Apr 24, 2024 | Annual | 5P | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Jan 16, 2024 | Annual | 5S | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Jan 17, 2024 | Annual | 6W | Yes | Epoxy | Full Tank | Good | Jun 30, 2020 | Apr 24, 2024 | Annual |
Anodes Fitted: No |
|
7.1 |
Ballast Handling Data
Number | Type | Prime mover type | Capacity (m3/hr) | Head (bar) |
---|
2 | CENTRIFUGAL | ELECTRIC | 500.00 | 30.00 |
|
7.2 |
Does the vessel comply with D1 or D2 performance standards? |
D2 |
7.3 |
Does the vessel have a Ballast Water Treatment System (BWTS) fitted? |
Yes |
7.4 |
What type of BWTS fitted? If other system fitted, please advise: |
Other (specify), Electrolytic Disinfection System |
7.5 |
Name of manufacturer of BWTS: |
TECHCROSS |
7.6 |
Does the BWTS have IMO type approval? |
Yes |
7.7 |
Is the BWTS of a USCG approved type? |
Yes |
|
8.1 |
Is vessel fitted with centerline bulkhead in all cargo tanks? If Yes, solid or perforated: |
Yes, Solid |
8.2 |
Cargo Tank Capacities at 98% Full - Centre:
Total Centre: m3
Cargo Tank Capacities at 98% Full - Wing:
Tank Number | Capacity (m3) | P/S |
---|
1 | 1492.3 | Port | 1 | 1500.7 | Stbd | 2 | 2483.5 | Port | 2 | 2496.4 | Stbd | 3 | 2667.6 | Port | 3 | 2676 | Stbd | 4 | 2671.8 | Port | 4 | 2680.2 | Stbd | 5 | 2666.2 | Port | 5 | 2674.6 | Stbd | 6 | 2378.4 | Port | 6 | 2381.1 | Stbd | SLOP | 455.5 | Port | SLOP | 446.5 | Stbd |
Total Wing: 28,768.59 m3
Deck Tank Capacities at 98% Full:
Total Deck: m3
|
8.2.1 |
Capacity (98%) of each natural segregation with double valve (specify tanks): |
1P- 1492.246 m3 1S- 1500.772 m3 2P- 2483.418 m3 2S- 2496.354 m3 3P- 2667.560 m3 3S- 2675.988 m3 4P- 2671.774 m3 4S- 2680.202 m3 5P- 2666.188 m3 5S- 2674.616 m3 6P- 2378.362 m3 6S- 2381.106 m3 Slop tanks are with double valve segregation SL(P)- 455.504 m3, SL(S)-446.488 m3 (Total - 14 Nos of segregation including Slops) (Total Segregation 14 Nos including Slop tanks.) |
8.2.2 |
IMO class (Oil/Chemical Ship Type 1, 2 or 3): |
IMO 2 |
8.3 |
Slop tank capacities (98%):
Total: 901.992 m3
|
8.4 |
How many grades/products can vessel load/discharge with double valve segregation: |
14 |
8.4.1 |
State type of cargo containment (integral, independent, gravity or pressure tanks): |
2G (Integral Gravity) |
8.5 |
Are there any cargo tank filling restrictions?
If yes, specify number of slack tanks, max s.g., ullage restrictions etc.:
|
Yes 100% SG of 1.025 |
8.6 |
Max loading rate for homogenous cargo |
With VECS |
Without VECS |
Loaded per manifold connection: |
375 m3/hr |
375 m3/hr |
Loaded simultaneously through all manifolds: |
2,250 m3/hr |
2,250.00 m3/hr |
8.7 |
Is ship fitted with a Cargo Control Room (CCR)? |
Yes |
8.8 |
Can tank innage / ullage be read from the CCR? |
Yes |
8.9 |
Is gauging system certified and calibrated? If no, specify which ones are not calibrated: |
Yes, Closed |
|
What type of gauging system as per IBC 13.1 is fitted (Open/Restricted/Closed): |
Radar |
|
Is a tank overflow control system fitted? If yes, then state if system includes automatic closing of valves? |
Yes, N/A |
8.9.2 |
Are cargo tanks fitted with multipoint gauging? If yes, specify type and locations: |
No, |
8.10 |
Number of portable gauging units (example- MMC) on board: |
3 |
8.11 |
Is a Vapour Emission Control System (VECS) fitted? |
Yes |
|
If fitted, is vapour line return manifold in compliance with OCIMF Guidelines? |
Yes |
|
If fitted, how many vapor return segregations can the vessel maintain simultaneously? |
|
|
Does the ship possess Vapour Emission Control (VEC) Certification? If yes, state the issuing authority |
Yes, LR |
8.12 |
Number/size of VECS manifolds (per side): |
2 |
250 mm |
8.13 |
Number / size / type of VECS reducers: |
04 Nos x 10 inch x 10 inch
01 No x 10 inch x 8 inch
Type-ANSI |
8.14 |
State what type of venting system is fitted: |
P/V Valve |
8.15 |
Total number/size of cargo manifold connections on each side:
No.: 15 (12 x 150 mm + 2 x 100 mm)
Size:
Manifold | PCS | Size | Unit | Pressure Rating | Unit PR | Standard |
---|
1 | P | 150 | mm | 16 | KG/Cm2 | ANSI | 1 | S | 150 | mm | 16 | KG/Cm2 | ANSI | 2 | P | 150 | mm | 16 | KG/Cm2 | ANSI | 2 | S | 150 | mm | 16 | KG/Cm2 | ANSI | 3 | P | 150 | mm | 16 | KG/Cm2 | ANSI | 3 | S | 150 | mm | 16 | KG/Cm2 | ANSI | 4 | P | 150 | mm | 16 | KG/Cm2 | ANSI | 4 | S | 150 | mm | 16 | KG/Cm2 | ANSI | 5 | P | 150 | mm | 16 | KG/Cm2 | ANSI | 5 | S | 150 | mm | 16 | KG/Cm2 | ANSI | 6 | P | 150 | mm | 16 | KG/Cm2 | ANSI | 6 | S | 150 | mm | 16 | KG/Cm2 | ANSI | SLOP | P | 100 | mm | 16 | KG/Cm2 | ANSI | SLOP | S | 150 | mm | 16 | KG/Cm2 | ANSI |
|
8.15.1 |
Is the vessel fitted with a fixed common line? |
Yes |
|
What is the number of common cargo connections per side? |
1 |
|
What is the size of common cargo connections? |
300 mm |
8.16 |
What type of valves are fitted at manifold: |
Butterfly, |
8.17 |
What is the material/rating of the manifold: |
SUS316 / ANSI 150 PSI |
8.18 |
Distance between cargo manifold centers: |
295.00 mm |
8.19 |
Distance ships rail to manifold: |
5,100.00 mm |
8.20 |
Distance manifold to ships side: |
5,100.00 mm |
8.21 |
Top of rail to center of manifold: |
700.00 mm |
8.22 |
Distance main deck to center of manifold: |
2,100.00 mm |
8.23 |
Spill tank grating to center of manifold: |
900.00 mm |
8.24 |
Manifold height above the waterline in normal ballast / at SDWT condition: |
11.67 m |
7.68 m |
8.25 |
Number / size / type of reducers: |
6 x 150/300mm (6/12") 6 x 150/250mm (6/10") 6 x 150/200mm (6/8") 1 x 100/300mm (4/12") 1 x 100/250mm (4/10") ( 1 x 100/200 mm (4/8")
----------------------------------
CY1 type: 3 x 150mm x 150 mm x 150 mm
SY1 type: 1 x 100mm x 100mm x 100mm
CU1 type: 3 x 150mm x 150mm
CU2 type: 3 x 150mm x 150mm
SU1 type: 1 x 100mm x 100mm
SU2 type: 1 x 100mm x 100mm
VU1 type: 1 x 250mm x 250mm) ANSI |
8.26 |
Is vessel fitted with a stern manifold? If yes, state size: |
No, mm |
8.27 |
Provide details of Heating Coils/Heat Exchangers |
Tank ID | P/C/S/ Decktank/ Other | Heat exchanger | Internal/External | External ducts | Heating coils | Heating coil sets | Height of the heating coils above tank bottom (mm) | total heating surface (m2) | Ratio of the heating surface | Welded or coupled | Material |
---|
1 | P | Yes | External | | No | | | | | | | 1 | S | Yes | External | | No | | | | | | | 2 | P | Yes | External | | No | | | | | | | 2 | S | Yes | External | | No | | | | | | | 3 | P | Yes | External | | No | | | | | | | 3 | S | Yes | External | | No | | | | | | | 4 | P | Yes | External | | No | | | | | | | 4 | S | Yes | External | | No | | | | | | | 5 | P | Yes | External | | No | | | | | | | 5 | S | Yes | External | | No | | | | | | | 6 | P | Yes | External | | No | | | | | | | 6 | S | Yes | External | | No | | | | | | | SLOP | P | No | | | Yes | 2 | 180 | | | Welded | SS | SLOP | S | No | | | Yes | 2 | 180 | | | Welded | SS |
|
8.27.1 |
Is a Thermal Oil Heating system fitted? If yes, identify tanks? |
No, |
8.28 |
Maximum temperature cargo can be loaded / maintained: |
70.0 °C / 158.0 °F |
60 °C / 140 °F |
8.28.1 |
Minimum temperature cargo can be loaded / maintained: |
|
|
8.29 |
Is an Inert Gas System (IGS) fitted / operational? |
Yes / N/A |
8.30 |
Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen: |
Nitrogen Generator (1 x 100/200 mm (4/8")
----------------------------------
CY1 type: 3 x 150mm x 150 mm x 150 mm
SY1 type: 1 x 100mm x 100mm x 100mm
CU1 type: 3 x 150mm x 150mm
CU2 type: 3 x 150mm x 150mm
SU1 type: 1 x 100mm x 100mm
SU2 type: 1 x 100mm x 100mm
VU1 type: 1 x 250mm x 250mm) |
8.30.1 |
If nitrogen generator, specify the applicable flow rate for each of the designed purity modes: |
2850 cbm/hr |
8.31 |
How many cargo pumps can be run simultaneously at full capacity: |
6 |
8.32 |
Cargo Pump Data |
Pump Identity | Pump Location | Type | Type of prime mover | Capacity | At what head? |
---|
1PORT | Cargo Tank | Centrifugal | Electric | 375 M3/H | 120[m] | 1STBD | Cargo Tank | Centrifugal | Electric | 375 M3/H | 120[m] | 2PORT | Cargo Tank | Centrifugal | Electric | 375 M3/H | 120[m] | 2STBD | Cargo Tank | Centrifugal | Electric | 375 M3/H | 120[m] | 3PORT | Cargo Tank | Centrifugal | Electric | 375 M3/H | 120[m] | 3STBD | Cargo Tank | Centrifugal | Electric | 375 M3/H | 120[m] | 4PORT | Cargo Tank | Centrifugal | Electric | 375 M3/H | 120[m] | 4STBD | Cargo Tank | Centrifugal | Electric | 375 M3/H | 120[m] | 5PORT | Cargo Tank | Centrifugal | Electric | 375 M3/H | 120[m] | 5STBD | Cargo Tank | Centrifugal | Electric | 375 M3/H | 120[m] | 6PORT | Cargo Tank | Centrifugal | Electric | 375 M3/H | 120[m] | 6STBD | Cargo Tank | Centrifugal | Electric | 375 M3/H | 120[m] | SLOP PORT | Cargo Tank | Centrifugal | Electric | 150 M3/H | 120[m] | SLOP STBD | Cargo Tank | Centrifugal | Electric | 150 M3/H | 120[m] |
|
8.33 |
Is at least one emergency portable cargo pump provided? |
Yes |
8.34 |
Is tank cleaning equipment fixed in cargo tanks? |
Yes |
8.35 |
Is portable tank cleaning equipment provided? |
Yes |
8.36 |
Tank washing pump capacity: |
100.00 m3/hr |
8.37 |
Is a washing water heater fitted? If yes is it operational and state max washing water temperature: |
Yes, Yes 80.00 °C |
8.38 |
What is the maximum number of machines that can be operated at their designed max pressure? |
4 |
8.39 |
Is vessel fitted with a remote cargo tank temperature monitoring system. If yes, is it operational? |
Yes, Yes |
8.40 |
Is vessel fitted with a remote cargo tank pressure monitoring system. If yes, is it operational? |
Yes, Yes |
8.41 |
Is vessel fitted with a cargo tank drier. If yes is it operational and state capacity: |
No, N/A m3/hr |
8.42 |
Is vessel fitted with a cargo cooling system. If yes is it operational and state tanks applicable: |
No, N/A
|
8.43 |
Is steam available on deck? |
Yes |
|
9.1 |
Provide details for Mooring Ropes, Wires, Tails and Shackles |
Type | Location and Identity | Material | Diameter/size | Length | LDBF(100-105 % of SDMBL (Tonnes)) | TDBF(125-130 % of SDMBL (Tonnes) | SWL (tonnes) | WLL (tonnes) (50-55% of Max LDBF) | Certificate No. | Installed Date | Reversed Date | Renewal2 Date | Status of line/tail | Condition of line/tail |
---|
Ropes | FWD OUTER STBD 1-1 | DYNEEMA | 27.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 20R113141 | 2020-06-30 | 2023-10-04 | 2021-10-09 | In Use | Suitable | Ropes | FWD INNER STBD 1-2 | DYNEEMA | 27.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 20R113157 | 2020-10-13 | 2023-10-04 | 2021-10-13 | In Use | Suitable | Ropes | FWD INNER PORT 2-1 | DYNEEMA | 27.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 20R113143 | 2020-06-30 | 2023-10-04 | 2021-10-09 | In Use | Suitable | Ropes | FWD OUTER PORT 2-2 | DYNEEMA | 27.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 20R113144 | 2020-06-30 | 2023-10-04 | 2021-10-09 | In Use | Suitable | Ropes | MAIN DECK FWD M1 | DYNEEMA | 27.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 20R113145 | 2020-06-30 | 2023-10-04 | 2021-10-09 | In Use | Suitable | Ropes | MAIN DECK AFT M2 | DYNEEMA | 27.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 20R113151 | 2020-06-30 | 2023-10-04 | 2021-10-09 | In Use | Suitable | Ropes | AFT OUTER STBD 3-1 | DYNEEMA | 27.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 20R113152 | 2020-06-30 | 2023-10-04 | 2021-10-09 | In Use | Suitable | Ropes | AFT INNER STBD 3-2 | DYNEEMA | 27.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 20R113153 | 2020-06-30 | 2023-10-04 | 2021-10-09 | In Use | Suitable | Ropes | AFT INNER PORT 4-1 | DYNEEMA | 27.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 20R113154 | 2020-06-30 | 2023-10-04 | 2021-10-09 | In Use | Suitable | Ropes | AFT OUTER PORT 4-2 | DYNEEMA | 27.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 20R113155 | 2020-06-30 | 2021-10-09 | 2021-10-09 | In Use | Suitable | Ropes | LOOSE FWD L-1 | DYNEEMA | 27.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 20R113141 | 2020-10-13 | 2020-10-13 | 2022-10-13 | In Use | Suitable | Ropes | LOOSE FWD L-2 | DYNEEMA | 27.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 21F004168 | 2022-04-19 | 2022-04-19 | 2022-04-19 | In Use | Suitable | Ropes | LOOSE AFT L-3 | DYNEEMA | 27.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 20R113158 | 2020-10-13 | 2020-10-13 | 2020-10-13 | In Use | Suitable | Ropes | LOOSE AFT L-6 | DYNEEMA | 27.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 21F004169 | 2022-04-19 | 2022-04-19 | 2022-04-19 | In Use | Suitable | Ropes | LOOSE FWD L-4 | POLYPROPYLENE | 56.00 | 200.00 | 60.00 | 73.00 | 61.20 | 29.00 | DYT20/205-1 | 2020-06-30 | 2020-06-30 | 2020-06-30 | In Use | Suitable | Ropes | LOOSE FWD L-6 | POLYPROPYLENE | 56.00 | 200.00 | 60.00 | 73.00 | 61.20 | 29.00 | DYT20/205-2 | 2020-06-30 | 2023-10-05 | 2020-06-30 | In Use | Suitable | Ropes | LOOSE AFT L-7 | POLYPROPYLENE | 56.00 | 200.00 | 60.00 | 73.00 | 61.20 | 29.00 | DYT20/205-3 | 2020-06-30 | 2023-10-05 | 2020-06-30 | In Use | Suitable | Ropes | LOOSE AFT L-8 | POLYPROPYLENE | 56.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | DYT20/205-4 | 2020-06-30 | 2023-10-05 | 2020-06-30 | In Use | Suitable | Ropes | SPARE | DYNEEMA | 28.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 18174CHN22 | 2022-04-19 | 2022-04-19 | 2022-04-19 | Spare | Suitable | Ropes | SPARE | DYNEEMA | 28.00 | 200.00 | 60.00 | 73.00 | 60.00 | 29.00 | 18199CHN22 | 2022-04-19 | 2022-04-19 | 2022-04-19 | Spare | Suitable | Tails | 1-1 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 32696 | Aug 05, 2024 | | | In Use | Suitable | Tails | 1-2 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 32697 | Aug 05, 2024 | | | In Use | Suitable | Tails | 2-1 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 32698 | Aug 05, 2024 | | | In Use | Suitable | Tails | 2-2 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 32700 | Aug 05, 2024 | | | In Use | Suitable | Tails | M-1 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 32701 | Aug 05, 2024 | | | In Use | Suitable | Tails | M-2 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 32702 | Aug 05, 2024 | | | In Use | Suitable | Tails | 3-1 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 32703 | Aug 05, 2024 | | | In Use | Suitable | Tails | 3-2 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 32704 | Aug 05, 2024 | | | In Use | Suitable | Tails | 4-1 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 32705 | Aug 05, 2024 | | | In Use | Suitable | Tails | 4-2 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 32706 | Aug 05, 2024 | | | In Use | Suitable | Tails | L-1 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 36000 | Aug 05, 2024 | | | In Use | Suitable | Tails | L-2 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 36056 | Aug 05, 2024 | | | In Use | Suitable | Tails | L-3 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 36058 | Aug 05, 2024 | | | In Use | Suitable | Tails | L-4 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 36059 | Aug 05, 2024 | | | In Use | Suitable | Tails | L-6 | POLYPROPYLENE | 56.00 | 11.00 | 60.00 | 73.00 | 74 | 29.00 | 36060 | Aug 05, 2024 | | | In Use | Suitable |
|
9.2 |
Details of winches and brake testing including rendering loads |
Mooring winch Location | Split Drum | Motive Power | Remote Operational controls | Heaving power | Hauling Speed | Type of Brake | Designed Brake Max holding load (ISO) (80% of SDMB | Operational brake holding load (60% of SDMBL) | Date of last brake test | Brake Rendering load | Frequency of testing brakes |
---|
1 | | Hydraulic | | 15.30 | 50.00 | Manual | 46.40 | 34.80 | Sep 15, 2024 | 34.80 | YEARLY | 2 | | Hydraulic | | 15.30 | 50.00 | Manual | 46.40 | 34.80 | Sep 15, 2024 | 34.80 | YEARLY | 3 | | Hydraulic | | 15.30 | 50.00 | Manual | 46.40 | 34.80 | Sep 15, 2024 | 34.80 | YEARLY | 4 | | Hydraulic | | 15.30 | 50.00 | Manual | 46.40 | 34.80 | Sep 15, 2024 | 34.80 | YEARLY | 5 | | Hydraulic | | 15.30 | 50.00 | Manual | 46.40 | 34.80 | Sep 15, 2024 | 34.80 | YEARLY | 11 | | Hydraulic | | 15.30 | 50.00 | Manual | 46.40 | 34.80 | Sep 15, 2024 | 34.80 | YEARLY | 13 | | Hydraulic | | 15.30 | 50.00 | Manual | 46.40 | 34.80 | Sep 15, 2024 | 34.80 | YEARLY | 14 | | Hydraulic | | 15.30 | 50.00 | Manual | 46.40 | 34.80 | Sep 15, 2024 | 34.80 | YEARLY | 15 | | Hydraulic | | 15.30 | 50.00 | Manual | 46.40 | 34.80 | Sep 15, 2024 | 34.80 | YEARLY | 16 | | Hydraulic | | 15.30 | 50.00 | Manual | 46.40 | 34.80 | Sep 15, 2024 | 34.80 | YEARLY |
|
9.3 |
Provide Details of Mooring bollards and bitts |
Location | Identity No | Certificate Number | Size (mm) | SWL (tonnes) |
---|
Forecastle | 1 | - | 400 | 58 | Forecastle | 2 | - | 400 | 58 | Forecastle | 3 | - | 400 | 58 | Forecastle | 4 | - | 400 | 58 | Maindeck Forward (Port) | 5 | - | 350 | 46 | Maindeck Forward (Port) | 6 | - | 400 | 58 | Maindeck Forward (Port) | 7 | - | 300 | 25 | Maindeck Forward (Stbd) | 8 | - | 350 | 46 | Maindeck Forward (Stbd) | 9 | - | 400 | 58 | Maindeck Forward (Stbd) | 10 | - | 400 | 58 | Maindeck Forward (Port) | 11 | - | 350 | 25 | Maindeck Forward (Stbd) | 12 | - | 350 | 25 | Maindeck Forward (Stbd) | 13 | - | 400 | 58 | Maindeck Forward (Stbd) | 14 | - | 350 | 46 | Maindeck Forward (Port) | 15 | - | 300 | 25 | Maindeck Forward (Port) | 16 | - | 400 | 58 | Maindeck Forward (Port) | 17 | - | 350 | 46 | Poop Deck (Stbd) | 18 | - | 400 | 58 | Poop Deck (Stbd) | 19 | - | 400 | 58 | Poop Deck (Port) | 20 | - | 400 | 58 | Poop Deck (Port) | 21 | - | 400 | 58 |
|
9.4 |
Provide details of Mooring Fairleads/Chocks |
|
9.5 |
Number of shackles on port / starboard cable: |
11.00 / 11.00 |
9.6 |
Type / SWL of Emergency Towing system forward: |
KETSP-20A |
200 MT |
9.7 |
Type / SWL of Emergency Towing system aft: |
KETA-45F |
100 MT |
9.8 |
What is size of closed chock and/or fairleads of enclosed type on stern: |
1160X504X1130 |
9.9 |
What is SWL of closed chock and/or fairleads of enclosed type on stern: |
102.00 MT |
9.10 |
What is SWL of bollard on poop deck suitable for escort tug: |
102.00 MT |
9.11 |
Derrick / Crane description (Number, SWL and location): |
Cranes: 1 x 10 Tonnes Midship |
9.12 |
Accommodation ladder direction: |
Aft |
9.13 |
Does vessel have a portable gangway? If yes, state length: |
Yes |
10 m |
9.14 |
Does the vessel meet the recommendations in the latest edition of OCIMF 'Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings (SPM)'? |
Yes |
9.15 |
If fitted, how many chain stoppers: |
1 |
9.16 |
Details of Bow chain stoppers:
Location/Number of Bow Chain Stopper | Type | Operation | SWL | Min Size of Chain | Max size of Chain |
---|
Port | Tongue | Manual | 204.00 | 76.00 | 76.00 |
|
9.17 |
Distance between the bow fairlead and chain stopper/bracket: |
1.40 m |
9.18 |
Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: |
Yes na |
|
10.1 |
Speed |
Maximum |
Economical |
Ballast speed: |
14.95 Kts (WSNP) |
12 Kts (WSNP) |
Laden speed: |
14.85 Kts (WSNP) |
12 Kts (WSNP) |
10.2 |
What type of fuel is used for main propulsion? If other, then specify: |
Other (specify), LSMGO, VLSFO |
|
What type of fuel is used for generating plant |
LSMGO, VLSFO |
10.3 |
Bunker Tank Capacities:
Tank Name | Bunker Type | Tank Type | Capacity | Max Pressure |
---|
HFO STBD | HFO | Main Bunker Tank | 307.70 | 4.50 | HFO PORT | HFO | Main Bunker Tank | 219.60 | 4.50 | HFO CENTER | HFO | Main Bunker Tank | 501.20 | 4.50 | MGO PORT | MDO | Main Bunker Tank | 129.60 | 4.50 | MGO STBD | MDO | Main Bunker Tank | 129.60 | 4.50 |
If other, then specify |
10.4 |
Is vessel fitted with fixed or controllable pitch propeller(s): |
Fixed |
10.5 |
Engines |
No |
Capacity |
Make/Type |
Main engine: |
1 |
7,000 Kw |
HYUNDAI-MAN B&W 6S46ME-B8.5-HPSCR |
Aux engine: |
3 |
1,120 Kw |
HYUNDAI HIMSEN,6H21/32,Four stroke,Trunk Piston,In |
Power packs: |
|
m3/hr |
|
Boilers: |
2 |
18.00 MT/Hr |
AALBORG OL,Automatic, Vertical forced draft, |
10.6 |
What is brake horse power of bow thruster (if fitted): |
No, bhp |
10.7 |
What is brake horse power of stern thruster (if fitted): |
No, bhp |
10.8 |
Does the vessel have an EEDI Rating number? If yes then provide EEDI rating: |
Yes, 6.92 |
|
If No then provide reason: |
|
|
Is the EEDI rating verified by Class, 3rd Party or Owner? |
Class |
10.9 |
Does the vessel have an EEXI Rating number? If yes then provide EEXI rating: |
Yes, |
|
If No then provide reason: |
|
|
Is the EEXI rating verified by Class, 3rd Party or Owner? |
|
10.10 |
Does the vessel have a CII Rating number? If yes then provide CII rating: |
Yes, |
|
If No then provide reason: |
|
|
Is the CII rating verified by Class, 3rd Party or Owner? |
|
10.11 |
Does the vessel have an EIV Rating number? If yes then provide EIV rating: |
Yes, |
|
If No then provide reason: |
|
|
Is the EIV rating verified by Class, 3rd Party or Owner? |
|
10.12 |
What is the ships NOx control level (Tier I, Tier II, and Tier III)?: |
Tier III |
|
List of equipment fitted for NOx Tier III achievement for all engines (LP Selective catalytic reduction, HP Selective catalytic reduction, Exhaust gas recirculation, Alternative fuel etc...) |
|
10.13 |
Does the vessel use an Exhaust Gas Cleaning System? |
No |
10.14 |
What is the type of scrubber fitted as part of the EGCS onboard? |
|
|
11.1 |
Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum, Chemicals or Liquified Gas, as applicable)? |
Yes |
11.2 |
What is maximum outreach of cranes / derricks outboard of the ship's side: |
7.20 m |
11.3 |
Date/place of last STS operation: |
25 OCT 2024 |
11.4 |
Does the vessel have a ship specific STS plan: |
|
|
12.1 |
Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last): |
|
12.2 |
Has ship been involved in a pollution, grounding, collision or allision incident during the past 12 months? If yes, provide details: No
|
12.3 |
Date and place of last Port State Control inspection: |
Aug 08, 2024, Porvoo (Borg) |
12.4 |
Any outstanding deficiencies as reported by any Port State Control? If yes, provide details: |
No
|
12.5 |
Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:
*"Approvals" are not given by Oil Majors and ships are accepted for the voyage on a case by case basis. |
Contact owner for details. |
12.6 |
Date / place of last SIRE inspection: |
Jun 01, 2024 / Mexico Veracruz [MXVER] |
12.6.1 |
Date / place of last CDI inspection: |
Oct 18, 2024 / ANTWERP, BELGIUM |
12.7 |
Additional information relating to features of the ship or operational characteristics: |
New Ship |