| 1.1 |
Date updated: |
May 04, 2026 |
| 1.2 |
Vessel's name (IMO number): |
Tristar Jisha (9655975) |
| 1.2b |
Is the vessel owner/manager a member of INTERTANKO? If yes, please provide IMO number of the Member organization |
Yes, 5184254 |
| 1.3 |
Vessel's previous name(s) and date(s) of change: |
Clearocean Maria (Aug 07, 2025) Alpine Maria (May 13, 2019) |
| 1.4 |
Date delivered / Builder (where built): |
Aug 22, 2014 / SPP Shipbuilding Co. Ltd. |
| 1.5 |
Flag / Port of Registry: |
Liberia / Monrovia |
| 1.6 |
Call sign / MMSI: |
D5FZ8 / 636016402 |
| 1.7 |
Vessel's contact details (satcom/fax/email etc.): |
Tel: 463715955 / 463715956 |
| Fax: 870783902166 |
| Email: tristarjisha@ishimafleet.com |
| 1.8 |
Type of vessel (as described in Form A or Form B Q1.11 of the IOPPC): |
Other |
| 1.8a |
If other type of vessel, please specify: |
Crude Oil / Product Carrier |
| 1.9 |
Type of hull: |
Double Hull |
| 1.10 |
Registered owner - Full style: IMO Number |
Tristar Jisha Pte.Ltd. 111 North Bridge Road, #08-11, Peninsula Plaza, Singapore 179098 Singapore Tel: +971-556090714 Email: tankerops@eships.ae IMO: 293939 |
| 1.11 |
Technical operator - Full style: |
ISHIMA Pte Ltd 6 Battery Road, #34-02, Singapore - 049909 Singapore Tel: +65 6586 0880 Fax: +65 6586 0899 Email: marine@ishimaship.com Web: www.ishimaship.com Company IMO#: 5184254 |
| 1.12 |
Commercial operator - Full style: |
Vitol International Shipping PTE. LTD. 128 Beach Road, 28th Floor, #28-01 Guoco Midtown, Singapore, 189773 Singapore Tel: +44 207 973 4202 Email: tristarjisha.ops@vitol.com |
| 1.13 |
Disponent owner - Full style: |
Vitol International Shipping PTE. LTD. 128 Beach Road, 28th Floor, #28-01 Guoco Midtown, Singapore, 189773 Singapore Tel: +44 207 973 4202 Email: tristarjisha.ops@vitol.com |
| 1.14 |
P & I Club - Full Style: |
Assuranceforeningen Gard (Gjensidig) 5th floor, The Minster Building, 21 Mincing Lane London EC3R 7AG United Kingdom |
| 1.15 |
P & I Club pollution liability coverage / expiration date: |
1,000,000,000 US$ |
Feb 20, 2027 |
| 1.16 |
Hull & Machinery insured by - Full Style: (Specify broker or leading underwriter) |
Assuranceforeningen Gard (Gjensidig) 5th floor, The Minster Building, 21 Mincing Lane London EC3R 7AG United Kingdom |
| 1.17 |
Hull & Machinery insured value / expiration date: |
29,000,000 US$ ((H&M - USD 19,378,786 / IV - USD 9,621,214)) |
May 08, 2027 |
| 1.18 |
Classification society: |
American Bureau of Shipping |
| 1.18a |
Is Classification Society an IACS member? |
Yes |
| 1.19 |
Class notation: |
+100A1, Double Hull Oil and Chemical Tanker, Ship Type 2 and Ship Type 3, CSR, ESP, ShipRight(CM, ACS(B)), LI, *IWS, SPM4, +LMC, IGS, UMS with descriptive notes "ShipRight(BWMP(S, T), SERS, SCM), Pt.Ht., ShipRight(IHM) |
| 1.20 |
Does the vessel have any open conditions of Class?? If yes List all open conditions: |
No
|
| 1.20a |
Does the vessel have any Memoranda of Class? If yes, list details: |
No
|
| 1.21 |
If classification society changed, name of previous and date of change: |
Lloyds Register, Aug 07, 2025 |
| 1.22 |
Does the vessel have ice class? If yes, state what level: |
No, |
| 1.23 |
Date / place of last dry-dock: |
Aug 03, 2024 / CUD Wei Hai Shipyard, Shidao, China |
| 1.24 |
Date next dry dock due / next annual survey due: |
Aug 21, 2029 |
|
| 1.25 |
Date of last special survey / next special survey due: |
Aug 22, 2024 |
Aug 21, 2029 |
| 1.26 |
If ship has Condition Assessment Program (CAP), what is the latest overall rating: |
No, |
| 1.27 |
Length overall (LOA): |
183.00 m |
| 1.28 |
Length between perpendiculars (LBP): |
174.00 m |
| 1.29 |
Extreme breadth (Beam): |
32.23 m |
| 1.30 |
Moulded depth: |
19.10 m |
| 1.31 |
Keel to masthead (KTM) / Keel to masthead (KTM) in collapsed condition, if applicable: |
48.60 m |
48.60 m |
| 1.32 |
Distance bridge front to center of manifold: |
57.60 m |
| 1.33 |
Bow to center manifold (BCM) / Stern to center manifold (SCM): |
89.60 m |
93.40 m |
| 1.34 |
Parallel body distances: |
Lightship |
Normal Ballast |
Summer Dwt |
| Forward to mid-point manifold: |
25.04 m |
33.06 m |
33.20 m |
| Aft to mid-point manifold: |
23.93 m |
42.88 m |
57.26 m |
| Parallel body length: |
48.96 m |
75.95 m |
90.46 m |
| 1.35 |
Net Tonnage: |
13,724.00 |
| 1.36 |
Gross Tonnage / Reduced Gross Tonnage (if applicable): |
29,705.00 |
|
| 1.37 |
Suez Canal Tonnage - Gross (SCGT) / Net (SCNT): |
31,246.27 |
26,695.10 |
| 1.38 |
Is vessel fitted for transit of Panama Canal? Panama Canal Net Tonnage (PCNT): |
, 24,760.00 |
| 1.39 |
Loadline |
Freeboard |
Draft |
Deadweight |
Displacement |
| Summer: |
5.86 m |
13.267 m |
49,999.00 MT |
60,709.30 MT |
| Winter: |
6.136 m |
12.991 m |
48,554.40 MT |
59,264.70 MT |
| Tropical: |
5.584 m |
13.543 m |
51,447.30 MT |
62,157.70 MT |
| Normal loaded condition: |
m |
m |
MT |
MT |
| Lightship: |
16.00 m |
3.00 m |
Not Applicable |
10,710.30 MT |
| Normal Ballast Condition: |
11.40 m |
7.69 m |
21,775.40 MT |
32,475.40 MT |
| Segregated Ballast Condition: |
11.50 m |
7.59 m |
21,291.80 MT |
31,991.80 MT |
| 1.40 |
FWA/TPC at summer draft: |
290.00 mm |
52.40 MT |
| 1.41 |
Have multiple deadweights been assigned? If yes, list all assigned deadweights: |
Yes Assigned DWT 1: 49,999.00 Assigned DWT 2: 44,999.00 Assigned DWT 3: 39,999.00 Assigned DWT 4: 34,999.00 Assigned DWT 5: |
| 1.42 |
Constant (excluding fresh water): |
450 MT |
| 1.43 |
What is the company guidelines for Under Keel Clearance (UKC) for this vessel? |
Open sea 50% of the static draft
Shallow coastal water: Gross UKC 15% of the static draft; Net UKC min. 2.0mtrs
Anchorage, Sea Berth: Gross UKC 20% of the static draft; Net UKC min. 3.0mtrs
Pilotage: Gross UKC 10% of the static draft; Net UKC min. 1.0mtrs
Berth : Gross UKC 10% of the static draft; Net UKC min. 1.5%of ship's Beam |
| 1.44 |
What is the max height of mast above waterline (air draft) |
Full Mast |
Collapsed Mast |
| Summer deadweight: |
35.33 m |
0 m |
| Normal ballast: |
40.90 m |
0 m |
| Lightship: |
45.60 m |
0 m |
| |
| 2.1 |
Safety Equipment Certificate (SEC): |
Aug 07, 2025 |
Not Applicable |
|
Aug 21, 2029 |
| 2.2 |
Safety Radio Certificate (SRC): |
Sep 19, 2025 |
Not Applicable |
|
Aug 21, 2029 |
| 2.3 |
Safety Construction Certificate (SCC): |
Aug 07, 2025 |
Not Applicable |
|
Aug 21, 2029 |
| 2.4 |
International Loadline Certificate (ILC): |
Jul 30, 2024 |
|
|
Aug 21, 2029 |
| 2.5 |
International Oil Pollution Prevention Certificate (IOPPC): |
Aug 07, 2025 |
Not Applicable |
|
Aug 21, 2029 |
| 2.6 |
International Ship Security Certificate (ISSC): |
Aug 07, 2025 |
Not Applicable |
Not Applicable |
Feb 06, 2030 |
| 2.7 |
Maritime Labour Certificate (MLC): |
Aug 07, 2025 |
Not Applicable |
|
Feb 06, 2030 |
| 2.8 |
Minimum Safe Manning Certificate (MSM): |
Aug 05, 2025 |
Not Applicable |
Not Applicable |
Not Applicable |
| 2.9 |
ISM Safety Management Certificate (SMC): |
Aug 07, 2025 |
Not Applicable |
Not Applicable |
Feb 06, 2030 |
| 2.10 |
Document of Compliance (DOC): |
Mar 06, 2026 |
Feb 14, 2025 |
|
Mar 02, 2031 |
| 2.11 |
USCG Certificate of Compliance (USCGCOC): |
Oct 27, 2024 |
Nov 21, 2025 |
Not Applicable |
Oct 27, 2026 |
| 2.12 |
Civil Liability Convention (CLC) 1992 Certificate: |
Feb 20, 2026 |
Not Applicable |
Not Applicable |
Feb 20, 2027 |
| 2.13 |
Civil Liability for Bunker Oil Pollution Damage Convention (CLBC) Certificate: |
Feb 20, 2026 |
Not Applicable |
Not Applicable |
Feb 20, 2027 |
| 2.14 |
Liability for the Removal of Wrecks Certificate (WRC): |
Feb 20, 2026 |
Not Applicable |
Not Applicable |
Feb 20, 2027 |
| 2.15 |
U.S. Certificate of Financial Responsibility (COFR): |
Aug 11, 2025 |
Not Applicable |
Not Applicable |
Aug 11, 2028 |
| 2.16 |
Certificate of Class (COC): |
Dec 11, 2025 |
Not Applicable |
Not Applicable |
Aug 21, 2029 |
| 2.17 |
Certificate of Registry (COR): |
Feb 03, 2026 |
Not Applicable |
Not Applicable |
Not Applicable |
| 2.18 |
International Sewage Pollution Prevention Certificate (ISPPC) |
Aug 07, 2025 |
Not Applicable |
Not Applicable |
Aug 21, 2029 |
| 2.19 |
Certificate of Fitness (COF): |
N/A |
N/A |
N/A |
N/A |
| 2.20 |
International Energy Efficiency Certificate (IEEC): |
Aug 07, 2025 |
Not Applicable |
Not Applicable |
Not Applicable |
| 2.21 |
International Air Pollution Prevention Certificate (IAPPC): |
Aug 07, 2025 |
Not Applicable |
Not Applicable |
Aug 21, 2029 |
| 2.22 |
Ship Sanitation Control (SSCC)/Ship Sanitation Control Exemption (SSCE): |
Apr 14, 2026 |
Not Applicable |
Not Applicable |
Oct 14, 2026 |
| 2.23 |
Does the vessel have an International Ballast Water Management Certificate? If no, then describe how ship complies with the "International Convention for the Control and Management of Ships' Ballast Water and Sediments"?: |
Yes, |
| 2.24 |
Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: |
Yes |
| 2.25 |
Does vessel have in place a Drug and Alcohol Policy complying with OCIMF guidelines for Control of Drugs and Alcohol Onboard Ship? |
Yes |
| 2.26 |
Is the ITF Special Agreement on board (if applicable)? |
No |
| 2.27 |
ITF Blue Card expiry date (if applicable): |
Aug 21, 2026 |
| |
| 3.1 |
Nationality of Master: |
Ukrainian |
| 3.2 |
Number and nationality of Officers: |
8 |
Indian, Ukrainian, Filipino |
| 3.3 |
Number and nationality of Crew: |
| Nationality | Count |
|---|
| PHILIPPINES | 10 | | INDIA | 5 |
|
| 3.4 |
What is the common working language onboard: |
English |
| 3.5 |
Do officers speak and understand English? |
Yes |
| 3.6 |
If Officers/ratings employed by a Manning Agency - Full style: |
Officers:
| Company Name | Address | Phone | Fax | Email |
|---|
| Sirius Ship Management | Via de Marini 53 16149 Genoa Italy | +39 010648941 | +39 0106489441 | bogliano@siriusship.com |
Ratings:
| Company Name | Address | Phone | Fax | Email |
|---|
| EPSILON MANILA | 4/F, Units A and B (LW), 5/F and11/F (portion), Vernida IV Bldg. 128 L.P. Leviste St. Salcedo Village Makati City, Philippines | 63 2 8813 8000 loc 110 //+63 9985961894 | N/A | sirius@epsilonmaritime.com.ph | | D'AMICO SHIP ISHIMA INDIA PVT LTD, | A201/202/203, Citi Point, J.B. Nagar, Andheri (E), Mumbai - 400059 | 022 4050 2100 Direct: 022 40502145 | N/A | crewing@damicoishima.com |
|
| |
| 4.1 |
Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter? |
Yes |
| 4.2 |
Qualified individual (QI) - Full style: |
Hudson Marine Management Service Hudson Marine Mangement Services,Ferry Terminal Bldg. Suite 300 2 Aquarium Dr. Camden, NJ 08103,U.S.A.
Tel: +1-856-342-7500(24hr) Fax: +1-856-342-888 Email: technical@hudsonmarine.com Web: www.hudsonmarine.com |
| 4.3 |
Oil Spill Response Organization (OSRO) - Full style: |
National Response Corporation National Response Corporation
3500, Sunrise Hwy Ste. T 103, Great River, NY 11739 Tel: +1 877 880- 4672 Fax: +1 631 224 9086 Email: iocdo@nrcc.com |
| 4.4 |
Salvage and Marine Firefighting Services (SMFF) - Full Style: |
Donjon-SMIT Americas, LLC 15402 Vantage Parkway East
Suite 316
Houston, Texas 77032 Email: admin@donjon-smit.com |
| |
| 5.1 |
Is the vessel operated under a Quality Management System? If Yes, what type of system? (ISO9001 or IMO Resolution A.741(18) as amended): |
Yes ISO9001:2015 |
| 5.2 |
Can the ship comply with the ICS Helicopter Guidelines? |
Yes |
| 5.2.1 |
If Yes, state whether winching or landing area provided: |
Winching |
| 5.2.2 |
If Yes, what is the diameter of the circle provided: |
6.29 m |
| |
| 6.1 |
Cargo tanks:
| Tank ID | Tank PSC | Tank Type | Constr | Coated Y/N | Coating Type | Extent | Condition | Date | Insp date | Insp Freq |
|---|
| 4 | S | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-02-18 | 30 Months | | 2 | P | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-02-18 | 30 Months | | 6 | P | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-02-18 | 30 Months | | 3 | S | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-02-18 | 30 Months | | 3 | P | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-02-18 | 30 Months | | 7 | S | Slop | Mild Steel | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-02-19 | 30 Months | | 1 | S | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-02-18 | 30 Months | | 8 | P | Residual | Mild Steel | yes | Epoxy | Full Tank | Good | 2014-08-22 | 2025-11-18 | 30 Months | | 5 | S | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-02-18 | 30 Months | | 6 | S | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-02-18 | 30 Months | | 4 | P | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-02-18 | 30 Months | | 7 | P | Slop | Mild Steel | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-12-19 | 30 Months | | 2 | S | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-02-18 | 30 Months | | 5 | P | 2 | Mild Steel | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-02-18 | 30 Months |
Anodes Fitted: No |
Ballast tanks:
| ID | Coated? | Type | Extent | Condition | Coating date | Insp date | Insp freq |
|---|
| 6P | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-03-02 | Biannual | | 6S | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-03-03 | Biannual | | 2S | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-03-03 | Biannual | | 2P | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-03-02 | Biannual | | 1S | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-03-03 | Biannual | | 4P | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-03-02 | Biannual | | 5P | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-03-02 | Biannual | | 3S | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-03-03 | Biannual | | 1P | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-03-02 | Biannual | | 5S | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-03-03 | Biannual | | 3P | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-03-02 | Biannual | | 4S | Yes | Epoxy | Full Tank | Good | 2014-08-22 | 2026-03-02 | Biannual | | FPK | yes | Epoxy | Full Tank | Good | 2014-08-22 | 2025-07-02 | Annual | | APK | yes | Epoxy | Full Tank | Good | 2014-08-22 | 2025-07-12 | Annual |
Anodes Fitted: Yes |
| |
| 7.1 |
Ballast Handling Data
| Number | Type | Prime mover type | Capacity (m3/hr) | Head (bar) |
|---|
| 2 | Submerged, Framo SB200 | Hydraulic | 750.00 | 30.00 |
|
| 7.2 |
Does the vessel comply with D1 or D2 performance standards? |
D2 |
| 7.3 |
Does the vessel have a Ballast Water Treatment System (BWTS) fitted? |
Yes |
| 7.4 |
What type of BWTS fitted? If other system fitted, please advise: |
Other (specify), Electro-cleen TM system |
| 7.5 |
Name of manufacturer of BWTS: |
Techcross |
| 7.6 |
Does the BWTS have IMO type approval? |
Yes |
| 7.7 |
Is the BWTS of a USCG approved type? |
Yes |
| |
| 8.1 |
Is vessel fitted with centerline bulkhead in all cargo tanks? If Yes, solid or perforated: |
Yes, Solid |
| 8.2 |
Cargo Tank Capacities at 98% Full - Centre:
Total Centre: 0 m3
Cargo Tank Capacities at 98% Full - Wing:
| Tank Number | Capacity (m3) | P/S |
|---|
| 1 | 3063.80 | Port | | 1 | 3069.40 | Stbd | | 2 | 4533.10 | Port | | 2 | 4524.20 | Stbd | | 3 | 4721.50 | Port | | 3 | 4710.20 | Stbd | | 4 | 4723.70 | Port | | 4 | 4713.20 | Stbd | | 5 | 4700.70 | Port | | 5 | 4685.00 | Stbd | | 6 | 4133.10 | Port | | 6 | 4116.70 | Stbd |
Total Wing: 51,694.60 m3
Deck Tank Capacities at 98% Full:
Total Deck: m3
|
| 8.2a |
Grand Total Cubic Capacity (98%) (centre + wing tanks): |
51,694.60 m3 |
| 8.2.1 |
Capacity (98%) of each natural segregation with double valve (specify tanks): |
Seg#1: 6133.1 m3 (COT's 1 Port & 1 Stbd) Seg#2: 9057.2 m3 (COT's 2 Port & 2 Stbd) Seg#3: 9431.6 m3 (COT's 3 Port & 3 Stbd) Seg#4: 9436.8 m3 (COT's 4 Port & 4 Stbd) Seg#5: 9385.7 m3 (COT's 5 Port & 5 Stbd) Seg#6: 8249.7 m3 (COT's 6 Port & 6 Stbd) |
| 8.2.2 |
IMO class (Oil/Chemical Ship Type 1, 2 or 3): |
IMO 2 |
| 8.3 |
Slop tank capacities (98%):
| Tank Number | Capacity (m3) | P/S |
|---|
| Slop | 520.60 | Port | | Slop | 671.30 | Stbd |
Total: 1,191.90 m3
|
| 8.3.1 |
Specify segregations which slops tanks belong to and their capacity with double valve: |
|
| 8.3.2 |
Residual/Retention oil tank(s) capacity (98%), if applicable: |
157.40 m3 |
| 8.3.3 |
What is total SBT capacity and percentage of SDWT vessel can maintain? |
22,425.40 m3 |
46 % |
| 8.3.4 |
Does vessel meet the requirements of MARPOL Annex I Reg 18.2: |
Yes |
| 8.4 |
How many grades/products can vessel load/discharge with double valve segregation: |
6 |
| 8.4.1 |
State type of cargo containment (integral, independent, gravity or pressure tanks): |
Integral |
| 8.5 |
Are there any cargo tank filling restrictions? If yes, specify number of slack tanks, max s.g., ullage restrictions etc.: |
Yes The hull structures are designed for unrestricted partial loading upto cargo S.G 1.53 with filling limitation of 1.025/Cargo S.G. in tank depth. |
| 8.6 |
Max loading rate for homogenous cargo |
With VECS |
Without VECS |
| Loaded per manifold connection: |
1,520 m3/hr |
1,520 m3/hr |
| Loaded simultaneously through all manifolds: |
4,560.00 m3/hr |
4,560.00 m3/hr |
| 8.7 |
Is ship fitted with a Cargo Control Room (CCR)? |
Yes |
| 8.8 |
Can tank innage / ullage be read from the CCR? |
Yes |
| 8.9 |
Is gauging system certified and calibrated? If no, specify which ones are not calibrated: |
Yes, |
|
What type of gauging system as per IBC 13.1 is fitted (Open/Restricted/Closed): |
OPTIWAVE 8300 C RADAR (Closed) |
|
What type of fixed closed tank gauging system is fitted: |
N/A |
|
Is a tank overflow control system fitted? If yes, then state if system includes automatic closing of valves? |
Yes, No |
|
Are high level alarms fitted to the cargo tanks? If Yes, indicate whether to all tanks or partial: |
Yes, Yes |
| 8.9.1 |
Can cargo be transferred under closed loading conditions in accordance with ISGOTT 11.1.6.6? |
N/A |
| 8.9.2 |
Are cargo tanks fitted with multipoint gauging? If yes, specify type and locations: |
No, |
| 8.10 |
Number of portable gauging units (example- MMC) on board: |
7 |
| 8.11 |
Is a Vapour Emission Control System (VECS) fitted? |
Yes |
|
If fitted, is vapour line return manifold in compliance with OCIMF Guidelines? |
Yes |
|
If fitted, how many vapor return segregations can the vessel maintain simultaneously? |
1 |
|
Does the ship possess Vapour Emission Control (VEC) Certification? If yes, state the issuing authority |
Yes, Lloyd's Register |
| 8.12 |
Number/size of VECS manifolds (per side): |
2 |
300 mm |
| 8.13 |
Number / size / type of VECS reducers: |
4 PCS/ ANSI/300 X 300 MM(12 X 12'')
2 PCS/ ANSI/ 300 X 400 MM(12X16'') |
| 8.14 |
State what type of venting system is fitted: |
PV valves |
| 8.15 |
Total number/size of cargo manifold connections on each side:
No.: 6
Size:
| Manifold | PCS | Size | Unit | Pressure Rating | Unit PR | Standard |
|---|
| 1 | P | 350 | mm | 150 | Psi | ANSI | | 1 | S | 350 | mm | 150 | Psi | ANSI | | 2 | P | 350 | mm | 150 | Psi | ANSI | | 2 | S | 350 | mm | 150 | Psi | ANSI | | 3 | P | 350 | mm | 150 | Psi | ANSI | | 3 | S | 350 | mm | 150 | Psi | ANSI | | 4 | P | 350 | mm | 150 | Psi | ANSI | | 4 | S | 350 | mm | 150 | Psi | ANSI | | 5 | P | 350 | mm | 150 | Psi | ANSI | | 5 | S | 350 | mm | 150 | Psi | ANSI | | 6 | P | 350 | mm | 150 | Psi | ANSI | | 6 | S | 350 | mm | 150 | Psi | ANSI |
|
| 8.15.1 |
Is the vessel fitted with a fixed common line? |
Yes |
|
What is the number of common cargo connections per side? |
6 |
|
What is the size of common cargo connections? |
350 mm |
| 8.16 |
What type of valves are fitted at manifold: |
Butterfly, |
| 8.17 |
What is the material/rating of the manifold: |
SUS 316 / |
| 8.17.1 |
Does vessel comply with the latest edition of the OCIMF 'Recommendations for Oil Tanker Manifolds and Associated Equipment'? |
Yes |
| 8.18 |
Distance between cargo manifold centers: |
2,000.00 mm |
| 8.19 |
Distance ships rail to manifold: |
4,402.00 mm |
| 8.20 |
Distance manifold to ships side: |
4,580.00 mm |
| 8.21 |
Top of rail to center of manifold: |
700.00 mm |
| 8.22 |
Distance main deck to center of manifold: |
2,100.00 mm |
| 8.23 |
Spill tank grating to center of manifold: |
900.00 mm |
| 8.24 |
Manifold height above the waterline in normal ballast / at SDWT condition: |
13.50 m |
7.933 m |
| 8.25 |
Number / size / type of reducers: |
12 x 350/400mm (14/16") 2 x 200/400mm (8/16") 6 x 350/250mm (14/10") 6 x 350/200mm (14/8") 6 x 350/300mm (14/12") ANSI |
| 8.26 |
Is vessel fitted with a stern manifold? If yes, state size: |
No, mm |
| 8.27 |
Provide details of Heating Coils/Heat Exchangers |
| Tank ID | P/C/S/ Decktank/ Other | Heat exchanger | Internal/External | External ducts | Heating coils | Heating coil sets | Height of the heating coils above tank bottom (mm) | total heating surface (m2) | Ratio of the heating surface | Welded or coupled | Material |
|---|
| 1 | P | no | Internal | no | yes | 2 | 150.00 | 34.70 | 0.01 | Welded | SS | | 1 | S | no | Internal | no | yes | 2 | 150.00 | 34.70 | 0.01 | Welded | SS | | 2 | P | no | Internal | no | yes | 2 | 150.00 | 47.37 | 0.01 | Welded | SS | | 2 | S | no | Internal | no | yes | 2 | 150.00 | 47.37 | 0.01 | Welded | SS | | 3 | P | no | Internal | no | yes | 2 | 150.00 | 48.15 | 0.01 | Welded | SS | | 3 | P | no | Internal | no | yes | 2 | 150.00 | 48.15 | 0.01 | Welded | SS | | 4 | P | no | Internal | no | yes | 2 | 150.00 | 48.15 | 0.01 | Welded | SS | | 4 | S | no | Internal | no | yes | 2 | 150.00 | 48.15 | 0.01 | Welded | SS | | 5 | P | no | Internal | no | yes | 2 | 150.00 | 48.15 | 0.01 | Welded | SS | | 5 | S | no | Internal | no | yes | 2 | 150.00 | 48.15 | 0.01 | Welded | SS | | 6 | P | no | Internal | no | yes | 2 | 150.00 | 44.31 | 0.01 | Welded | SS | | 6 | S | no | Internal | no | yes | 2 | 150.00 | 49.93 | 0.01 | Welded | SS | | 7 | P | no | Internal | no | yes | 2 | 150.00 | 21.42 | 0.03 | Welded | SS | | 7 | S | no | Internal | no | yes | 2 | 150.00 | 21.99 | 0.06 | Welded | SS | | 8 | P | no | Internal | no | yes | 2 | 150.00 | 12.96 | 0.03 | Welded | SS |
|
| 8.27.1 |
Is a Thermal Oil Heating system fitted? If yes, identify tanks? |
No, |
| 8.28 |
Maximum temperature cargo can be loaded / maintained: |
66.0 °C / 150.8 °F |
57 °C / 134.6 °F |
| 8.28.1 |
Minimum temperature cargo can be loaded / maintained: |
|
|
| 8.29 |
Is an Inert Gas System (IGS) fitted / operational? |
Yes / Yes |
| 8.29.1 |
Is a Crude Oil Washing (COW) installation fitted / operational? |
Yes / Yes |
| 8.30 |
Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen: |
IG Generator |
| 8.30.1 |
If nitrogen generator, specify the applicable flow rate for each of the designed purity modes: |
NA |
| 8.31 |
How many cargo pumps can be run simultaneously at full capacity: |
6 |
| 8.32 |
Cargo Pump Data |
| Pump Identity | Pump Location | Type | Type of prime mover | Capacity | At what head? |
|---|
| 1P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 1S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 2P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 2S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 3P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 3S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 4P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 4S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 5P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 5S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 6P | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | 6S | Cargo Tank | Centrifugal | Hydraulic | 600.00 | 125.00 | | SLOP P | Cargo Tank | Centrifugal | Hydraulic | 300.00 | 125.00 | | SLOP S | Cargo Tank | Centrifugal | Hydraulic | 300.00 | 125.00 |
|
| 8.33 |
Is at least one emergency portable cargo pump provided? |
Yes |
| 8.34 |
Is tank cleaning equipment fixed in cargo tanks? |
Yes |
| 8.35 |
Is portable tank cleaning equipment provided? |
Yes |
| 8.36 |
Tank washing pump capacity: |
120.00 m3/hr |
| 8.37 |
Is a washing water heater fitted? If yes is it operational and state max washing water temperature: |
Yes, Yes 70.00 °C |
| 8.38 |
What is the maximum number of machines that can be operated at their designed max pressure? |
9 |
| 8.39 |
Is vessel fitted with a remote cargo tank temperature monitoring system. If yes, is it operational? |
Yes, Yes |
| 8.40 |
Is vessel fitted with a remote cargo tank pressure monitoring system. If yes, is it operational? |
Yes, Yes |
| 8.41 |
Is vessel fitted with a cargo tank drier. If yes is it operational and state capacity: |
No, N/A m3/hr |
| 8.42 |
Is vessel fitted with a cargo cooling system. If yes is it operational and state tanks applicable: |
No, N/A
|
| 8.43 |
Is steam available on deck? |
Yes |
| |
| 9.1 |
Provide details for Mooring Ropes, Wires, Tails and Shackles |
| Type | Location and Identity | Material | Diameter/size | Length | LDBF(100-105 % of SDMBL (Tonnes)) | TDBF(125-130 % of SDMBL (Tonnes) | SWL (tonnes) | WLL (tonnes) (50-55% of Max LDBF) | Certificate No. | Installed Date | Reversed Date | Renewal2 Date | Status of line/tail | Condition of line/tail |
|---|
| Tails | Forecastle | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326334/DK21 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Ropes | Forecastle | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326522/DK2 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Ropes | Forecastle | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326523/DK3 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Tails | Forecastle | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326335/DK22 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Ropes | Forecastle | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326524/DK4 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Ropes | Main Deck FWD | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326525/DK5 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Ropes | Main Deck FWD | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326526/DK6 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Ropes | Main Deck FWD | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326527/DK7 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Ropes | Main Deck FWD | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326528/DK8 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Ropes | Main Deck Aft | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326529/DK9 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Ropes | Main Deck Aft | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326530/DK10 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Tails | Main Deck Aft | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326343/DK30 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Ropes | Poop Deck | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326531/DK11 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Ropes | Poop Deck | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326532/DK12 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Ropes | Poop Deck | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326533/DK13 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Tails | Forecastle | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326336/DK23 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Ropes | Poop Deck | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326534/DK14 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Ropes | Poop Deck | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326535/DK15 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Ropes | Poop Deck | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326536/DK16 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Ropes | Forecastle | COMPOSITE 8 | 54.00 | 220.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326354/DK17 7/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Ropes | Forecastle | COMPOSITE 8 | 54.00 | 220.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326355/DK18 7/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Ropes | Poop Deck | COMPOSITE 8 | 54.00 | 220.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326356/DK19 7/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Tails | Poop Deck | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326344/DK31 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Ropes | Poop Deck | COMPOSITE 8 | 54.00 | 220.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326357/DK20 7/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable | | Tails | Forecastle | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326337/DK24 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Tails | Main Deck FWD | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326338/DK25 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Tails | Main Deck FWD | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326339/DK26 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Tails | Main Deck FWD | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326340/DK27 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Tails | Main Deck FWD | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326341/DK28 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Tails | Main Deck Aft | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326342/DK29 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Tails | Poop Deck | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326345/DK32 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Tails | Poop Deck | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326346/DK33 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Tails | Poop Deck | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326347/DK34 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Tails | Poop Deck | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326348/DK35 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Tails | Poop Deck | COMPOSITE 8 | 64.00 | 11.00 | 0.00 | 66.30 | 0.00 | 25.50 | 326349/DK36 07/24 | 2024-08-12 | 2025-07-25 | 2026-08-11 | In Use | Suitable | | Ropes | Forecastle | UHMWPE | 28.00 | 250.00 | 52.00 | 0.00 | 0.00 | 25.50 | 326521/DK1 08/24 | 2024-08-12 | 2025-07-25 | 2034-08-11 | In Use | Suitable |
|
| 9.2 |
Details of winches and brake testing including rendering loads |
| Mooring winch Location | Split Drum | Motive Power | Remote Operational controls | Heaving power | Hauling Speed | Type of Brake | Designed Brake Max holding load (ISO) (80% of SDMB | Operational brake holding load (60% of SDMBL) | Date of last brake test | Brake Rendering load | Frequency of testing brakes |
|---|
| 1 | yes | Hydraulic | no | 16.00 | 0.25 | Spring | 40.80 | 30.60 | 2025-07-11 | 30.60 | Annual | | 6 | yes | Hydraulic | no | 16.00 | 0.25 | Spring | 40.80 | 30.60 | 2025-07-11 | 30.60 | Annual | | 4 | yes | Hydraulic | no | 16.00 | 0.25 | Spring | 40.80 | 30.60 | 2025-07-11 | 30.60 | Annual | | 7 | yes | Hydraulic | no | 16.00 | 0.25 | Spring | 40.80 | 30.60 | 2025-07-11 | 30.60 | Annual | | 5 | yes | Hydraulic | no | 16.00 | 0.25 | Spring | 40.80 | 30.60 | 2025-07-11 | 30.60 | Annual | | 2 | yes | Hydraulic | no | 16.00 | 0.25 | Spring | 40.80 | 30.60 | 2025-07-11 | 30.60 | Annual | | 3 | yes | Hydraulic | no | 16.00 | 0.25 | Spring | 40.80 | 30.60 | 2025-07-11 | 30.60 | Annual |
|
| 9.3 |
Provide Details of Mooring bollards and bitts |
| Location | Identity No | Certificate Number | Size (mm) | SWL (tonnes) |
|---|
| Forecastle | 2 | FH201021FB | 450 | 67 | | Forecastle | 1 | FH201021FB | 500 | 92 | | Maindeck Forward (Port) | 5 | FH201021FB | 450 | 64 | | Maindeck Forward (Stbd) | 5 | FH201021FB | 450 | 64 | | Poop Deck (Port) | 4 | FH201021FB | 450 | 64 | | Poop Deck (Stbd) | 4 | FH201021FB | 450 | 64 |
|
| 9.4 |
Provide details of Mooring Fairleads/Chocks |
| Type | Location | Identity No | Certificate | Size (mm) | SWL (tonnes) | Modifications | If yes, are modifications class approved? |
|---|
| Panama type | Forecastle | 2 | FH201021FB | 526 | 92 | no | no | | Panama type | Maindeck Forward (Port) | 1 | FH201021FB | 358 | 64 | no | no | | Panama type | Maindeck Forward (Stbd) | 1 | FH201021FB | 358 | 64 | no | no | | Panama type | Poop Deck (Port) | 3 | FH201021FB | 358 | 64 | no | no | | Panama type | Poop Deck (Stbd) | 3 | FH201021FB | 358 | 64 | no | no | | Universal roller fairlead | Forecastle | 4 | FH201021FB | 315 | 67 | no | no | | Universal roller fairlead | Poop Deck (Port) | 2 | FH201021FB | 315 | 67 | no | no | | Universal roller fairlead | Poop Deck (Stbd) | 2 | FH201021FB | 315 | 67 | no | no | | Closed chock | Forecastle | 2 | FH201021FB | 358 | 67 | no | no | | Closed chock | Maindeck Forward (Port) | 10 | FH201021FB | 358 | 67 | no | no | | Closed chock | Maindeck Forward (Port) | 2 | FH201021FB | 526 | 92 | no | no | | Closed chock | Maindeck Forward (Port) | 4 | FH201021FB | 358 | 26 | no | no | | Closed chock | Maindeck Forward (Stbd) | 10 | FH201021FB | 358 | 67 | no | no | | Closed chock | Maindeck Forward (Stbd) | 2 | FH201021FB | 358 | 92 | no | no | | Closed chock | Maindeck Forward (Stbd) | 3 | FH201021FB | 358 | 26 | no | no | | Closed chock | Poop Deck (Port) | 4 | FH201021FB | 358 | 67 | no | no | | Closed chock | Poop Deck (Stbd) | 4 | FH201021FB | 358 | 67 | no | no |
|
| 9.5 |
Number of shackles on port / starboard cable: |
11.00 / 12.00 |
| 9.6 |
Type / SWL of Emergency Towing system forward: |
Chain Stopper with chafing chain |
200 MT |
| 9.7 |
Type / SWL of Emergency Towing system aft: |
Towing pennant with pick up gear |
204 MT |
| 9.8 |
What is size of closed chock and/or fairleads of enclosed type on stern: |
1100 x 500 x 1100 |
| 9.9 |
What is SWL of closed chock and/or fairleads of enclosed type on stern: |
204.00 MT |
| 9.10 |
What is SWL of bollard on poop deck suitable for escort tug: |
204.00 MT |
| 9.11 |
Derrick / Crane description (Number, SWL and location): |
Cranes: 1 x 10.00 Tonnes Center |
| 9.12 |
Accommodation ladder direction: |
Aft |
| 9.13 |
Does vessel have a portable gangway? If yes, state length: |
Yes |
12.20 m |
| 9.14 |
Does the vessel meet the recommendations in the latest edition of OCIMF 'Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings (SPM)'? |
Yes |
| 9.15 |
If fitted, how many chain stoppers: |
1 |
| 9.16 |
Details of Bow chain stoppers:
| Location/Number of Bow Chain Stopper | Type | Operation | SWL | Min Size of Chain | Max size of Chain |
|---|
| Port | Tongue | Manual | 200.00 | 76.00 | 76.00 |
|
| 9.17 |
Distance between the bow fairlead and chain stopper/bracket: |
3.20 m |
| 9.18 |
Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: |
Yes
|
| |
| 10.1 |
Speed |
Maximum |
Economical |
| Ballast speed: |
14.50 Kts (WSNP) |
12.00 Kts (WSNP) |
| Laden speed: |
14.00 Kts (WSNP) |
12.00 Kts (WSNP) |
| 10.2 |
What type of fuel is used for main propulsion? If other, then specify: |
HFO, |
|
What type of fuel is used for generating plant |
FO & MGO |
| 10.3 |
Bunker Tank Capacities:
| Tank Name | Bunker Type | Tank Type | Capacity | Max Pressure |
|---|
| LSHFO (P) | HFO | Main Bunker Tank | 149.70 | 1.00 | | NO 1 HFO (P) | HFO | Main Bunker Tank | 333.20 | 1.00 | | NO 1HFO (S) | HFO | Main Bunker Tank | 420.40 | 1.00 | | NO 2 HFO (S) | HFO | Main Bunker Tank | 148.30 | 1.00 | | LS HFO SETT | HFO | Settling Tank | 49.30 | 1.00 | | LS HFO SERV | HFO | Service Tank | 73.70 | 1.00 | | FO SERV | HFO | Service Tank | 41.90 | 1.00 | | FO OVERFLOW | HFO | Service Tank | 16.10 | 1.00 | | NO 1 MGO STOR (S) | MDO | Main Bunker Tank | 70.60 | 1.00 | | MGO SETT | MDO | Settling Tank | 21.50 | 1.00 | | MGO SERV | MDO | Service Tank | 32.30 | 1.00 |
If other, then specify |
| 10.4 |
Is vessel fitted with fixed or controllable pitch propeller(s): |
Fixed |
| 10.5 |
Engines |
No |
Capacity |
Make/Type |
| Main engine: |
1 |
7,240 Kw |
HYUNDAI -B&W, 6S50ME-B9.3 (TIER II) |
| Aux engine: |
3 |
960 Kw |
HYUNDAI-HIMSEN |
| Power packs: |
4 |
0.80 m3/hr |
FRAMO/ 2 ELECTRICAL & 2 DIESEL |
| Boilers: |
2 |
18.00 MT/Hr |
AALBORG- CAP 18000KG/HR |
| 10.6 |
What is brake horse power of bow thruster (if fitted): |
No, bhp |
| 10.7 |
What is brake horse power of stern thruster (if fitted): |
No, bhp |
| 10.8 |
Does the vessel have an EEDI Rating number? If yes then provide EEDI rating: |
No, BTS/STL/S140572 |
|
If No then provide reason: |
The Ship is exempt under regulation 20.1 as it is not a new ship as defined in regulation 2.23 of Marpol Annex VI |
|
Is the EEDI rating verified by Class, 3rd Party or Owner? |
Class |
| 10.9 |
Does the vessel have an EEXI Rating number? If yes then provide EEXI rating: |
Yes, 4.10 |
|
If No then provide reason: |
|
|
Is the EEXI rating verified by Class, 3rd Party or Owner? |
Class |
| 10.10 |
Does the vessel have a CII Rating number? If yes then provide CII rating: |
Yes, B |
|
If No then provide reason: |
|
|
Is the CII rating verified by Class, 3rd Party or Owner? |
Class |
| 10.11 |
Does the vessel have an EIV Rating number? If yes then provide EIV rating: |
No, |
|
If No then provide reason: |
|
|
Is the EIV rating verified by Class, 3rd Party or Owner? |
|
| 10.12 |
What is the ships NOx control level (Tier I, Tier II, and Tier III)?: |
Tier II |
|
List of equipment fitted for NOx Tier III achievement for all engines (LP Selective catalytic reduction, HP Selective catalytic reduction, Exhaust gas recirculation, Alternative fuel etc...) |
|
| 10.13 |
Does the vessel use an Exhaust Gas Cleaning System? |
No |
| 10.14 |
What is the type of scrubber fitted as part of the EGCS onboard? |
|
| |
| 11.1 |
Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum, Chemicals or Liquified Gas, as applicable)? |
Yes |
| 11.2 |
What is maximum outreach of cranes / derricks outboard of the ship's side: |
8.90 m |
| 11.3 |
Date/place of last STS operation: |
21-July-2025, La Libertad, Ecuador |
| 11.4 |
Does the vessel have a ship specific STS plan: |
|
| |
| 12.1 |
Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last): |
|
| 12.2 |
Has ship been involved in a pollution, grounding, collision or allision incident during the past 12 months? If yes, provide details: No
|
| 12.3 |
Date and place of last Port State Control inspection: |
Apr 06, 2026, Bilbao |
| 12.4 |
Any outstanding deficiencies as reported by any Port State Control? If yes, provide details: |
No
|
| 12.5 |
Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:
*"Approvals" are not given by Oil Majors and ships are accepted for the voyage on a case by case basis. |
Contact owner for details. |
| 12.6 |
Date / place of last SIRE inspection: |
Apr 27, 2026 / Amsterdam |
| 12.6.1 |
Date / place of last CDI inspection: |
N/A |
| 12.7 |
Additional information relating to features of the ship or operational characteristics: |
Vessel equipped with ballast water treatment system. |