1.1 |
Date updated: |
Dec 02, 2024 |
1.2 |
Vessel's name (IMO number): |
Tristar Shamal (9506198) |
1.2b |
Is the vessel owner/manager a member of INTERTANKO? If yes, please provide IMO number of the Member organization |
, |
1.3 |
Vessel's previous name(s) and date(s) of change: |
ESHIPS SHAMAL (Nov 04, 2020) |
1.4 |
Date delivered / Builder (where built): |
Aug 02, 2010 / STX Busan |
1.5 |
Flag / Port of Registry: |
Gibraltar / Gibraltar |
1.6 |
Call sign / MMSI: |
ZDJT9 / 236567000 |
1.7 |
Vessel's contact details (satcom/fax/email etc.): |
Tel: +33 249 881 874 ; +44 203 769 2892 |
Fax: 00442037692892 |
Email: master@tristarshamal.tristar.commbox.com |
1.8 |
Type of vessel (as described in Form A or Form B Q1.11 of the IOPPC): |
Gas |
1.8a |
If other type of vessel, please specify: |
|
1.9 |
Type of hull: |
Double Hull |
1.10 |
Registered owner - Full style: IMO Number |
ESHIPS LPG 2 Limited Trust company complex, Ajeltake Road, Ajeltake Island, Majuro,Marshall Island.
MH96960 Marshall Islands Tel: +971-45103505 Fax: +971-2626-8661 Telex: Not applicable Email: tankerops@eships.ae IMO: |
1.11 |
Technical operator - Full style: |
V.Ships France SAS 34, Place Viarme, Nantes, 44000 France Tel: +33.2.28.09.34.20 Fax: +33.2.28.09.34.44 Telex: n/a Email: france.tankers@vships.com Web: n/a Company IMO#: 1971011 |
1.12 |
Commercial operator - Full style: |
CSSA Chartering and Shipping Services SA. LPG Operations Department, World Trade Centre 1,PO Box 170, 1215 Geneva 15 Airport, Switzerland. Switzerland Tel: +41 22 710 11 23 Fax: +41-22-788-2581 Email: cssa.lpg@totsa.com ; lpg.shipping@totsa.com |
1.13 |
Disponent owner - Full style: |
Not Applicable Not Applicable Tel: 0 Fax: 0 Telex: 0 Email: Not Applicable Web: Not Applicable |
1.14 |
P & I Club - Full Style: |
Gard P&I (Bermuda) Ltd. Assuranceforeningen Gard - gjensidig -,
UK Branch
5th floor, The Minster Building,
21 Mincing Lane
London EC3R 7AG, United Kingdom Tel: +47 90 52 41 00 |
1.15 |
P & I Club pollution liability coverage / expiration date: |
1,000,000,000 US$ |
Feb 20, 2025 |
1.16 |
Hull & Machinery insured by - Full Style: (Specify broker or leading underwriter) |
Gallagher London The Walbrook Building
25 Walbrook
London
EC4N 8AW Tel: +442072344720 |
1.17 |
Hull & Machinery insured value / expiration date: |
21,000,000 US$ |
May 08, 2025 |
1.18 |
Classification society: |
DNV |
1.18a |
Is Classification Society an IACS member? |
Yes |
1.19 |
Class notation: |
+1A1 Tanker for Liquefied Gas BIS BWM(E(s)) CLEAN E0 TMON VCS(2) |
1.20 |
Does the vessel have any open conditions of Class?? If yes List all open conditions: |
No
|
1.20a |
Does the vessel have any Memoranda of Class? If yes, list details: |
Yes
Memoranda of Class | Issue Date |
---|
MO 15 | Oct 24, 2023 | MO 17 | Dec 02, 2023 | MO 18 | Dec 02, 2023 |
|
1.21 |
If classification society changed, name of previous and date of change: |
, Not Applicable |
1.22 |
Does the vessel have ice class? If yes, state what level: |
No, N/A |
1.23 |
Date / place of last dry-dock: |
Nov 13, 2020 / Rotterdam |
1.24 |
Date next dry dock due / next annual survey due: |
Nov 13, 2025 |
Oct 01, 2025 |
1.25 |
Date of last special survey / next special survey due: |
Nov 13, 2020 |
Aug 02, 2025 |
1.26 |
If ship has Condition Assessment Program (CAP), what is the latest overall rating: |
No, (Not Applicable) |
1.27 |
Length overall (LOA): |
116.40 m |
1.28 |
Length between perpendiculars (LBP): |
109.00 m |
1.29 |
Extreme breadth (Beam): |
18.02 m |
1.30 |
Moulded depth: |
10.10 m |
1.31 |
Keel to masthead (KTM) / Keel to masthead (KTM) in collapsed condition, if applicable: |
37.30 m |
m |
1.32 |
Distance bridge front to center of manifold: |
34.20 m |
1.33 |
Bow to center manifold (BCM) / Stern to center manifold (SCM): |
55.40 m |
61.00 m |
1.34 |
Parallel body distances: |
Lightship |
Normal Ballast |
Summer Dwt |
Forward to mid-point manifold: |
16.12 m |
20.27 m |
27.55 m |
Aft to mid-point manifold: |
24.22 m |
30.11 m |
41.75 m |
Parallel body length: |
40.34 m |
50.38 m |
69.30 m |
1.35 |
Net Tonnage: |
2,181.00 |
1.36 |
Gross Tonnage / Reduced Gross Tonnage (if applicable): |
7,267.00 |
|
1.37 |
Suez Canal Tonnage - Gross (SCGT) / Net (SCNT): |
7,727.03 |
5,742.78 |
1.38 |
Is vessel fitted for transit of Panama Canal? Panama Canal Net Tonnage (PCNT): |
, |
1.39 |
Loadline |
Freeboard |
Draft |
Deadweight |
Displacement |
Summer: |
2.11 m |
8.00 m |
7,879.69 MT |
11,987.10 MT |
Winter: |
2.28 m |
7.83 m |
7,561.00 MT |
11,680.20 MT |
Tropical: |
1.95 m |
8.17 m |
8,176.30 MT |
12,295.50 MT |
Normal loaded condition: |
2.11 m |
8.00 m |
7,879.69 MT |
11,987.10 MT |
Lightship: |
6.91 m |
3.20 m |
Not Applicable |
4,107.00 MT |
Normal Ballast Condition: |
5.22 m |
4.89 m |
2,527.40 MT |
6,847.40 MT |
Segregated Ballast Condition: |
5.22 m |
4.89 m |
2,527.40 MT |
6,634.40 MT |
1.40 |
FWA/TPC at summer draft: |
163.00 mm |
18.50 MT |
1.41 |
Have multiple deadweights been assigned? If yes, list all assigned deadweights: |
No Assigned DWT 1: Assigned DWT 2: Assigned DWT 3: Assigned DWT 4: Assigned DWT 5: |
1.42 |
Constant (excluding fresh water): |
38.80 MT |
1.43 |
What is the company guidelines for Under Keel Clearance (UKC) for this vessel? |
Open Sea (FAOP): The minimum UKC in the dynamic condition is 50% of the static draft.
Restricted Waters/Port Approaches/Harbour Transits (SBE): The minimum UKC in the dynamic condition is 10% of the static draft.
Tankers Only SBM / CBM mooring: the minimum UKC is 10% of the static draft.
Alongside (1st Line Ashore to SBE):
For vessels <20m breadth: 0.30 metres
For vessels >20m breath: 1.5% of the ships beam |
1.44 |
What is the max height of mast above waterline (air draft) |
Full Mast |
Collapsed Mast |
Summer deadweight: |
37.30 m |
0 m |
Normal ballast: |
31.74 m |
0 m |
Lightship: |
34.10 m |
0 m |
|
2.1 |
Safety Equipment Certificate (SEC): |
Jun 02, 2024 |
Oct 01, 2024 |
Oct 01, 2024 |
Aug 02, 2025 |
2.2 |
Safety Radio Certificate (SRC): |
Nov 17, 2020 |
Sep 20, 2024 |
Sep 20, 2024 |
Aug 02, 2025 |
2.3 |
Safety Construction Certificate (SCC): |
Nov 13, 2020 |
Oct 01, 2024 |
Oct 01, 2024 |
Aug 02, 2025 |
2.4 |
International Loadline Certificate (ILC): |
Nov 13, 2020 |
Sep 20, 2024 |
Sep 20, 2024 |
Aug 02, 2025 |
2.5 |
International Oil Pollution Prevention Certificate (IOPPC): |
Jul 06, 2022 |
Sep 20, 2024 |
Sep 20, 2024 |
Aug 02, 2025 |
2.6 |
International Ship Security Certificate (ISSC): |
Feb 27, 2023 |
Not Applicable |
Not Applicable |
Mar 04, 2028 |
2.7 |
Maritime Labour Certificate (MLC): |
Feb 27, 2023 |
Not Applicable |
|
Mar 04, 2028 |
2.8 |
Minimum Safe Manning Certificate (MSM): |
Feb 27, 2023 |
Not Applicable |
Not Applicable |
Mar 04, 2028 |
2.9 |
ISM Safety Management Certificate (SMC): |
Feb 17, 2023 |
Not Applicable |
Not Applicable |
Mar 04, 2028 |
2.10 |
Document of Compliance (DOC): |
Mar 23, 2023 |
Apr 15, 2024 |
|
Apr 05, 2028 |
2.11 |
USCG Certificate of Compliance (USCGCOC): |
May 02, 2023 |
Not Applicable |
Not Applicable |
Not Applicable |
2.12 |
Civil Liability Convention (CLC) 1992 Certificate: |
Not Applicable |
Not Applicable |
Not Applicable |
Not Applicable |
2.13 |
Civil Liability for Bunker Oil Pollution Damage Convention (CLBC) Certificate: |
Feb 20, 2023 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.14 |
Liability for the Removal of Wrecks Certificate (WRC): |
Feb 20, 2023 |
Not Applicable |
Not Applicable |
Feb 20, 2025 |
2.15 |
U.S. Certificate of Financial Responsibility (COFR): |
Aug 02, 2023 |
Not Applicable |
Not Applicable |
Aug 03, 2026 |
2.16 |
Certificate of Class (COC): |
Nov 13, 2020 |
Oct 01, 2024 |
Oct 01, 2024 |
Aug 02, 2025 |
2.17 |
Certificate of Registry (COR): |
|
Not Applicable |
Not Applicable |
|
2.18 |
International Sewage Pollution Prevention Certificate (ISPPC) |
Sep 10, 2021 |
Not Applicable |
Not Applicable |
Aug 02, 2025 |
2.19 |
Certificate of Fitness (COF) (Chemical): |
Oct 11, 2020 |
Sep 20, 2024 |
Sep 20, 2024 |
Aug 02, 2025 |
2.20 |
Certificate of Fitness (COF) (Gas): |
Not Applicable |
Not Applicable |
Not Applicable |
Not Applicable |
2.21 |
Noxious Liquids Substance Certificate (NLS) |
Nov 13, 2020 |
Oct 01, 2023 |
Sep 20, 2024 |
Aug 02, 2025 |
2.22 |
International Energy Efficiency Certificate (IEEC): |
Dec 02, 2023 |
Not Applicable |
Not Applicable |
Not Applicable |
2.23 |
International Air Pollution Prevention Certificate (IAPPC): |
Dec 02, 2023 |
Sep 20, 2024 |
Sep 20, 2024 |
Aug 02, 2025 |
2.24 |
Does the vessel have an International Ballast Water Management Certificate? If no, then describe how ship complies with the "International Convention for the Control and Management of Ships' Ballast Water and Sediments"?: |
Yes, |
2.25 |
Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: |
Yes |
2.26 |
Does vessel have in place a Drug and Alcohol Policy complying with OCIMF guidelines for Control of Drugs and Alcohol Onboard Ship? |
Yes |
2.27 |
Is the ITF Special Agreement on board (if applicable)? |
Yes |
2.28 |
ITF Blue Card expiry date (if applicable): |
Dec 31, 2024 |
|
3.1 |
Nationality of Master: |
Georgian |
3.2 |
Number and nationality of Officers: |
Ukrainian, Latvian, Romanian, Russian, Georgian |
3.3 |
Number and nationality of Crew: |
Nationality | Count |
---|
Philippines | 6 | Ghana | 1 | Cote d'Ivoire | 1 |
|
3.4 |
What is the common working language onboard: |
English |
3.5 |
Do officers speak and understand English? |
Yes |
3.6 |
If Officers/ratings employed by a Manning Agency - Full style: Officers:
Company Name | Address | Phone | Fax | Email |
---|
Vships France; | 34 Place de Viarme, 44000 Nantes, France | +33228093420; | n/a | crew.france@vships.com; |
Ratings:
Company Name | Address | Phone | Fax | Email |
---|
Vships France; | 34 Place de Viarme, 44000 Nantes, France / Aseana Two Building, Bradco Avenue, Aseana City,Paranaque City, Manila, Philippines | +33228093420; / +632 8589842; | n/a | crew.france@vships.com; / Coleen.DeGuzman@vships.com; |
|
|
4.1 |
Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter? |
No |
4.2 |
Qualified individual (QI) - Full style: |
|
4.3 |
Oil Spill Response Organization (OSRO) - Full style: |
|
4.4 |
Salvage and Marine Firefighting Services (SMFF) - Full Style: |
|
|
5.1 |
Is the vessel operated under a Quality Management System? If Yes, what type of system? (ISO9001 or IMO Resolution A.741(18) as amended): |
Yes ISO 9001 / ISO 14001 |
5.2 |
Can the ship comply with the ICS Helicopter Guidelines? |
No |
5.2.1 |
If Yes, state whether winching or landing area provided: |
|
5.2.2 |
If Yes, what is the diameter of the circle provided: |
m |
|
6.1 |
Cargo tanks:
Tank ID | Tank PSC | Tank Type | Constr | Coated Y/N | Coating Type | Extent | Condition | Date | Insp date | Insp Freq |
---|
1 | C | 2g | SS | No | Uncoated | Full Tank | Good | 2010-07-30 | 2020-11-13 | 30 Months | 2 | C | 2g | SS | No | Uncoated | Full Tank | Good | 2010-07-30 | 2020-11-13 | 30 Months |
Anodes Fitted: No |
Ballast tanks:
ID | Coated? | Type | Extent | Condition | Coating date | Insp date | Insp freq |
---|
F.P. | Yes | Epoxy | Full Tank | Good | 2010-07-30 | Apr 14, 2024 | Annual | 2 port & strb | Yes | Epoxy | Full Tank | Good | 2010-07-30 | 2023-08-16 | Annual | 3 port & strb | Yes | Epoxy | Full Tank | Good | 2010-07-30 | 2023-11-05 | Annual | 4 port & strb | Yes | Epoxy | Full Tank | Good | 2010-07-30 | 2023-10-06 | Annual | 5 port & strb | Yes | Epoxy | Full Tank | Good | 2010-07-30 | Jun 05, 2024 | Annual | 6 port & strb | Yes | Epoxy | Full Tank | Good | Jul 30, 2010 | Jun 05, 2024 | Annual | 7 port & strb | Yes | Epoxy | Full Tank | Good | 2010-07-30 | Jun 05, 2024 | Annual | 1 D/B C | Yes | Epoxy | Full Tank | Good | 2010-07-30 | 2023-11-05 | Annual | 2 D/B C | Yes | Epoxy | Full Tank | Good | 2010-07-30 | 2023-11-05 | Annual | A.P. | Yes | Epoxy | Full Tank | Good | 2010-07-30 | May 03, 2024 | Annual | DEEP C | Yes | Epoxy | Full Tank | Good | 2010-07-30 | 2023-10-06 | Annual | 1 port and starboard | Yes | Epoxy | Full Tank | Good | 2010-07-30 | 2023-11-07 | Annual |
Anodes Fitted: Yes |
|
7.1 |
Ballast Handling Data
Number | Type | Prime mover type | Capacity (m3/hr) | Head (bar) |
---|
2 | Centrifugal | Electric | 150 | 150 | 1 | Ejector | sea water | 50 | 50 |
|
7.2 |
Does the vessel comply with D1 or D2 performance standards? |
D2 |
7.3 |
Does the vessel have a Ballast Water Treatment System (BWTS) fitted? |
Yes |
7.4 |
What type of BWTS fitted? If other system fitted, please advise: |
UV Light, |
7.5 |
Name of manufacturer of BWTS: |
OPTIMARIN BALLAST SYSTEM |
7.6 |
Does the BWTS have IMO type approval? |
Yes |
7.7 |
Is the BWTS of a USCG approved type? |
No |
|
8.1 |
Does the vessel comply with GC/IGC Code requirements? |
Yes |
8.2 |
What is the minimum/maximum permissible tank pressure? |
-0.30 KP/CM2 |
5.50 KP/CM2 |
8.3 |
What is the minimum permissible tank temperature? |
-48.00 °C |
8.4 |
State any limitations regarding partially filled cargo tanks |
|
8.5 |
List the products which the ship is certified to carry |
Propylene, Propane, Commercial Propane, Butane/Propane Mixtures, Anhydrous Ammonia, Vinyl Chloride Monomer, i-Butane, Butylene, Butadiene, n-Butane, Methyl Chloride, Acetaldehyde, Dimethylamine, Diethyl Ether, Ethylene Oxide / Propylene oxide with ethylene content of not more than 30% by weight, Isoprene, Isopropylamine, Ethyl Choride, Monoethylamine, Propylene Oxide, Vinyl Ethyl Ether, Mixed C4 |
8.5.1 |
If other, then specify |
DiethylEther, Dimethylamine, Ethyl Choride, Ethylene oxide-propylene oxide mixtures with ethylene oxide contentnot more than 30 % by weight, Isopropylamine, Methyl Chloride, Mixed C4 cargoes,Monoethylamine,Commercial propane,Propylene Oxide,Vinyl Ethyl Ether |
8.6 |
Cargo Tank Capacities
Tank Number | Tank Location (Multi-select) | Capacity @ 98% | Capacity @ 100% |
---|
1 | Centre | 3210.256 | 3275.77 | 2 | Centre | 3210.654 | 3276.18 |
Total Cargo Tank Capacities M3 98%: 6,420.91 m3
Total Cargo Tank Capacities M3 100%: 6,551.95 m3
|
8.7 |
Capacity (98%) of each natural segregation with double valve (specify tanks): |
Seg#1: 3210.256 m3 (1) Seg#2: 3210.654 m3 (2) |
8.8 |
Independent high level shut down system - Shut down level % |
98.00 % |
8.9 |
Deck tank(s) capacity (98%): |
Ammonia: m3 Butane: m3 Propane: m3 |
8.10 |
IGC Ship Type? What type and of what material are the cargo tanks constructed? |
2G, Independed cargo tanks type C. Material: Carbon-manganese steel , grade NV4-4L(LT) |
8.11 |
Heating medium of cargo heaters/vapourisers |
|
8.12 |
Maximum allowable relief valve setting (MARVS) |
5.50 Bar Gauge |
8.13 |
Maximum allowable relief valve setting for deck tanks. |
Bar Gauge |
8.14 |
Capacity of cargo heaters and vapourisers |
Kilowatt |
Propane: 700 m2/Hr Vap Ammonia: 700 m2/Hr Vap Nitrogen: m2/Hr Vap |
8.15 |
What is total SBT capacity and percentage of SDWT vessel can maintain? |
3,380.00 m3 |
43.60 % |
8.16 |
Is the ship shore link provided? If yes, does it comply with SIGTTO guidelines |
Yes |
Yes |
8.17 |
Number and capacity of compressors: |
2 |
730.00 m3/hr |
8.18 |
Manufacturer/type of compressors: |
Burckhardt Compression Type 2K-160 2H / Reciprocating |
8.19 |
Coolant type: |
Sea Water |
8.20 |
Max % Ethane the re-liquefaction plant can handle: |
% |
8.21 |
What is the maximum number of grades that can be loaded/carried/discharged simultaneously with complete segregation and without risk of contamination? |
2 |
8.22 |
What is the number of products that can be conditioned by reliquefication simultaneously? |
1 |
8.23 |
Are there any cargo tank filling restrictions?
If yes, specify number of slack tanks, max s.g., ullage restrictions etc.:
|
Yes, maximum loaded 98% |
8.24 |
Loading Rate from Refrigerated Storage: |
With Vapour Return |
Without Vapour Return |
|
Butane: |
480 MT/Hr |
480 MT/Hr |
|
Ammonia: |
545 MT/Hr |
545 MT/Hr |
|
Propane: |
464 MT/Hr |
464 MT/Hr |
|
Other*: |
750 MT/Hr |
750 MT/Hr |
|
*State other storage: |
VCM / Butadiene |
8.25 |
Max loading rate for homogenous cargo per manifold (without vapour return): |
800 m3/hr |
8.26 |
Is ship fitted with a Cargo Control Room (CCR)? |
Yes |
8.27 |
Can tank innage/ullage/pressure/temperature/reliquefication plant status be read from the CCR? |
Innage/Ullage: Yes
Pressure: Yes (Only via TGE software)
Temperature: Yes (Only via TGE software)
Plant Status: Yes
|
8.28 |
Gauges |
Manufacturer |
Type |
Rated Accuracy |
|
Level gauges: |
Henri System |
Float |
0.02 % |
|
Temperature gauges: |
Stahl Schaltgeraete |
Temp. Input Module 9480 |
0.03 % |
|
Pressure gauges: |
ABB |
265 GS |
0.04 % |
8.29 |
Sampling connection type and size: |
Screw |
10.00 mm |
8.30 |
Do manifold arrangements comply with SIGTTO standards? |
Yes |
8.31 |
What type of valves are fitted at manifold: |
Butterfly |
8.32 |
Cargo Manifold Dimensions: Manifold Diagram |
A: 0.00 mm
B: mm
C: 2,100.00 mm
D: 700.00 mm
E: 700.00 mm
F: 2,100.00 mm
G: 3,600.00 mm
H: mm
|
8.33 |
Distance manifold to ships side: |
2.62 m |
8.34 |
Distance manifold height above uppermost continuous deck: |
1,200.00 mm |
8.35 |
Manifold height above light/load waterline: |
10.10 m |
5.30 m |
8.36 |
Distance from rail of compressor room/platform to presentation flanges: |
mm |
8.37 |
Distance from deck of compressor room/platform to center of manifold: |
mm |
8.38 |
Reducers:
Number | Standard | Size (mm) | Length (mm) | Shape | Pressure Rating (bar) |
---|
18 | ANSI Class 300 | 200 | 500 | Other | 20 | 12 | ANSI Class 300 to 150 | 150 | 500 | Other | 10 |
|
|
If other, then specify |
|
8.39 |
Reducers additional comments: |
|
8.40 |
Pipe flanges:
Pipe Flange letter | Duty | Rating (bar) | Size | Raised/Flat face |
---|
E | Vapour | 20 | 150 | Raised | C | Cargo | 20 | 150 | Raised | F | Cargo | 20 | 200 | Raised | G | Fuel Oil | 10 | 100 | Raised |
|
8.41 |
Are local pressure gauges fitted outboard of the manifold valves? |
Yes |
|
Provide Make and Model of Reliquification Plant:
Make | Model | Capacity (MT/Day) |
---|
Burckhardt Compression Type 2K-160 2H / Reciprocating | Burckhardt Compression Type 2K-160 2H / Reciprocating | 730 | Burckhardt Compression Type 2K-160 2H / Reciprocating | Burckhardt Compression Type 2K-160 2H / Reciprocating | 730 |
|
8.42 |
Main IG Plant - Type of system: |
Other |
8.43 |
Capacity of Main IG Plant: |
m3/hr |
8.44 |
Type of fuel used: |
Other |
8.45 |
Composition if Main IG Plant |
Percent |
Oxygen: |
% |
CO2: |
% |
IG-NOx: |
0.00 % |
IG-N2: |
% |
8.46 |
Is vessel fitted with an Auxilliary or Nitrogen Plant? If yes, state type of system: |
, Nitrogen |
If other type, specify |
|
Capacity of system: |
600.00 m3/hr |
8.47 |
Lowest dew point achievable: |
°C |
8.48 |
Nitrogen liquid storage capacity: |
m3 |
8.49 |
How many cargo pumps can be run simultaneously at full capacity: |
2 |
8.50 |
Discharging: |
Type if Cargo Pumps |
No. of pumps per tank |
Rate per pump (m3/hr) |
At delivery head (mic) |
Maximum Density |
Cargo pumps |
Other |
1 |
350 m3/hr |
120 m liq col |
972 KH/Cu M |
Booster Pumps |
Centrifugal |
1 |
350 m3/hr |
120 m liq col |
680 KH/Cu M |
8.51 |
Cargo re-heaters/vaporizers: |
LPG Heater/ Vaporizer |
Vaporizer |
Type: |
Tube |
Seawater |
Heating medium: |
Seawater |
|
8.52 |
Type of hydrate control depressant provided onboard? If other, then specify |
Other, |
|
9.1 |
Provide details for Mooring Ropes, Wires, Tails and Shackles |
Type | Location and Identity | Material | Diameter/size | Length | LDBF(100-105 % of SDMBL (Tonnes)) | TDBF(125-130 % of SDMBL (Tonnes) | SWL (tonnes) | WLL (tonnes) (50-55% of Max LDBF) | Certificate No. | Installed Date | Reversed Date | Renewal2 Date | Status of line/tail | Condition of line/tail |
---|
Ropes | Aft - 2 pcs, spare | Mix PP/PES | 44 | 220 | 39.6 | 49.5 | 21.9 | 21.9 | 27042.3 / 27042.4 | 2022-04-10 | 2024-04-10 | 2026-04-10 | Spare | Suitable | Ropes | 6F/14 Forecastle | Mix PP/PES | 44 | 220 | 39.6 | 49.5 | 21.9 | 21.9 | 27042.1 | 2022-08-15 | 2024-08-15 | 2027-08-15 | In Use | Suitable | Ropes | 7F/11 Forecastle | Mix PP/PES | 44 | 220 | 36.7 | 45.8 | 21.9 | 21.9 | 220118440-3 | 2021-04-30 | 2023-10-26 | 2026-04-30 | In Use | Suitable | Ropes | 1A/07 Aft | Mix PP/PES | 44 | 220 | 36.0 | 46.8 | 21.9 | 21.9 | EXS/23/33334-1 | 2023-12-08 | 2026-06-08 | 2028-12-08 | In Use | Suitable | Ropes | 2A/08 Aft | Mix PP/PES | 48 | 220 | 36 | 46.8 | 21.9 | 21.9 | EXS/23/33334-2 | 2023-12-08 | 2026-06-08 | 2028-06-08 | In Use | Suitable | Ropes | 3A/05 Aft | Mix PP/PES | 48 | 220 | 36 | 46.8 | 21.9 | 21.9 | EXS/23/33334-3 | 2023-12-08 | 2026-06-08 | 2028-12-08 | In Use | Suitable | Ropes | 4A/06 Aft | Mix PP/PES | 48 | 220 | 36 | 46.8 | 21.9 | 21.9 | EXS/23/33334-4 | 2023-12-08 | 2026-06-08 | 2028-12-08 | In Use | Suitable | Ropes | 5A/10 Aft | Mix PP/PES | 44 | 220 | 36.7 | 45.8 | 21.9 | 21.9 | 220118440-1 | 2021-04-30 | 2023-10-26 | 2026-04-30 | In Use | Suitable | Ropes | 6A/09 Aft | Mix PP/PES | 44 | 220 | 36.7 | 45.8 | 21.9 | 21.9 | 220118440-2 | 2021-04-30 | 2023-10-26 | 2026-04-30 | In Use | Suitable | Ropes | 1F/01 Forecastle | Mix PP/PES | 48 | 220 | 38.9 | 42.8 | 21.9 | 21.9 | EXS/23/32397 - 1/2 | 2023-09-09 | 2025-09-09 | 2028-09-09 | In Use | Suitable | Ropes | 3F/03 Forecastle | Mix PP/PES | 44 | 220 | 36.7 | 45.8 | 21.9 | 21.9 | 220118440-5 | 2023-10-26 | 2025-10-26 | 2028-10-26 | In Use | Suitable | Ropes | 2F/02 Forecastle | Mix PP/PES | 44 | 220 | 38.9 | 48.6 | 21.9 | 21.9 | EXS/23/32397 - 2/2 | 2023-09-09 | 2025-09-09 | 2028-09-09 | In Use | Suitable | Ropes | 4F/04 Forecastle | Mix PP/PES | 44 | 220 | 39.6 | 49.5 | 21.9 | 21.9 | 27042.2 | 2023-10-26 | 2025-10-26 | 2028-10-26 | In Use | Suitable | Ropes | 7A/13 Aft | Mix PP/PES | 44 | 220 | 36 | 46.8 | 21.9 | 21.9 | 224108104-1 | May 30, 2024 | | | In Use | Suitable |
|
9.2 |
Details of winches and brake testing including rendering loads |
Mooring winch Location | Split Drum | Motive Power | Remote Operational controls | Heaving power | Hauling Speed | Type of Brake | Designed Brake Max holding load (ISO) (80% of SDMB | Operational brake holding load (60% of SDMBL) | Date of last brake test | Brake Rendering load | Frequency of testing brakes |
---|
2 | Yes | Hydraulic | No | 10 | 15 | Manual | 38 | 22.8 | 2024-02-14 | 22.8 | ANNUAL | 2 | Yes | Hydraulic | No | 10 | 15 | Manual | 38 | 22.8 | 2024-02-14 | 22.8 | ANNUAL |
|
9.3 |
Provide Details of Mooring bollards and bitts |
Location | Identity No | Certificate Number | Size (mm) | SWL (tonnes) |
---|
Forecastle | 1 | BO-F01 | 400 | 76 | Forecastle | 3 | BO-F02 | 400 | 46 | Poop Deck (Port) | 3 | BO-A01 | 400 | 46 |
|
9.4 |
Provide details of Mooring Fairleads/Chocks |
Type | Location | Identity No | Certificate | Size (mm) | SWL (tonnes) | Modifications | If yes, are modifications class approved? |
---|
Closed chock | Forecastle | 1 | PC-F01 | 400 | 76 | No | No | Closed chock | Forecastle | 2 | CC-F01, CC-F02 | 310 | 38 | No | No | Panama type | Forecastle | 1 | PC-F02 | 310 | 46 | No | No | Open roller type | Forecastle | 2 | DR-F01, DR-F02 | 250 | 10 | No | No | Panama type | Poop Deck (Port) | 1 | PC-A01 | 310 | 46 | No | No | Panama type | Poop Deck (Stbd) | 1 | PC-02 | 310 | 46 | No | No | Closed chock | Poop Deck (Port) | 2 | CC-A01, CC-A02 | 310 | 38 | No | No | Closed chock | Poop Deck (Stbd) | 2 | CC-A03, CC-A04 | 310 | 38 | No | No | Open roller type | Poop Deck (Port) | 1 | DR-A01 | 250 | 10 | No | No |
|
9.5 |
Number of shackles on port / starboard cable: |
10 / 9 |
9.6 |
Type / SWL of Emergency Towing system forward: |
Not Applicable |
0 MT |
9.7 |
Type / SWL of Emergency Towing system aft: |
Not Applicable |
0 MT |
9.8 |
What is size of closed chock and/or fairleads of enclosed type on stern: |
310 mm x 260 mm |
9.9 |
What is SWL of closed chock and/or fairleads of enclosed type on stern: |
46.00 MT |
9.10 |
What is SWL of bollard on poop deck suitable for escort tug: |
46.00 MT |
9.11 |
Derrick / Crane description (Number, SWL and location): |
Cranes: 1 x 3.00 Tonnes midship |
9.12 |
Accommodation ladder direction: |
Aft |
9.13 |
Does vessel have a portable gangway? If yes, state length: |
Yes |
8.00 m |
9.14 |
Does the vessel meet the recommendations in the latest edition of OCIMF 'Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings (SPM)'? |
No |
9.15 |
If fitted, how many chain stoppers: |
0 |
9.16 |
Details of Bow chain stoppers:
|
9.17 |
Distance between the bow fairlead and chain stopper/bracket: |
0 m |
9.18 |
Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: |
No 310mm X 260mm |
|
10.1 |
Speed |
Maximum |
Economical |
Ballast speed: |
14.60 Kts (WSNP) |
13.00 Kts (WSNP) |
Laden speed: |
14.60 Kts (WSNP) |
12.50 Kts (WSNP) |
10.2 |
What type of fuel is used for main propulsion? If other, then specify: |
MGO, |
|
What type of fuel is used for generating plant |
RMG 380CST / DMA LS |
10.3 |
Bunker Tank Capacities:
Tank Name | Bunker Type | Tank Type | Capacity | Max Pressure |
---|
LSHFO SETT.TANK | HFO | Settling Tank | 17.9 | 3 | HFO SETT. TANK | HFO | Settling Tank | 16.1 | 3 | LSHFO SERV. TANK | HFO | Service Tank | 18.8 | 3 | No.1 HFO TANK P | HFO | Main Bunker Tank | 72 | 3 | No.2 HFO TANK P | HFO | Main Bunker Tank | 117 | 3 | HFO SERV. TANK | HFO | Service Tank | 17.7 | 3 | MDO SETTLING TANK | MDO | Settling Tank | 8.4 | 3 | MDO SERV. TANK | MDO | Service Tank | 13.2 | 3 | No.1 S | MDO | Main Bunker Tank | 72 | 3 | No.2 S | MDO | Main Bunker Tank | 117 | 3 | No.3 | MDO | Main Bunker Tank | 60.6 | 3 | MDO TANK | MDO | Main Bunker Tank | 62.3 | 3 |
If other, then specify |
10.4 |
Is vessel fitted with fixed or controllable pitch propeller(s): |
Fixed |
10.5 |
Engines |
No |
Capacity |
Make/Type |
Main engine: |
1 |
4,440 Kw |
MOTOR STX-MAN / 6S35MC7 |
Aux engine: |
3 |
770 Kw |
STX Heavy Industry, 7L16/24 |
Power packs: |
|
m3/hr |
|
Boilers: |
1 |
1.20 MT/Hr |
|
10.6 |
What is brake horse power of bow thruster (if fitted): |
Yes, 611.00 bhp |
10.7 |
What is brake horse power of stern thruster (if fitted): |
No, 0 bhp |
10.8 |
Does the vessel have an EEDI Rating number? If yes then provide EEDI rating: |
No, NA |
|
If No then provide reason: |
N/A due to building date 2010 |
|
Is the EEDI rating verified by Class, 3rd Party or Owner? |
|
10.9 |
Does the vessel have an EEXI Rating number? If yes then provide EEXI rating: |
Yes, |
|
If No then provide reason: |
in progress by class - will be 15.972 |
|
Is the EEXI rating verified by Class, 3rd Party or Owner? |
|
10.10 |
Does the vessel have a CII Rating number? If yes then provide CII rating: |
Yes, A |
|
If No then provide reason: |
in progress by class |
|
Is the CII rating verified by Class, 3rd Party or Owner? |
|
10.11 |
Does the vessel have an EIV Rating number? If yes then provide EIV rating: |
, |
|
If No then provide reason: |
|
|
Is the EIV rating verified by Class, 3rd Party or Owner? |
|
10.12 |
What is the ships NOx control level (Tier I, Tier II, and Tier III)?: |
Tier I |
|
List of equipment fitted for NOx Tier III achievement for all engines (LP Selective catalytic reduction, HP Selective catalytic reduction, Exhaust gas recirculation, Alternative fuel etc...) |
|
10.13 |
Does the vessel use an Exhaust Gas Cleaning System? |
No |
10.14 |
What is the type of scrubber fitted as part of the EGCS onboard? |
|
|
11.1 |
Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum, Chemicals or Liquified Gas, as applicable)? |
No |
11.2 |
What is maximum outreach of cranes / derricks outboard of the ship's side: |
6.00 m |
11.3 |
Date/place of last STS operation: |
28/05/2024 Rotterdam |
11.4 |
Does the vessel have a ship specific STS plan: |
|
|
12.1 |
Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last): |
|
12.2 |
Has ship been involved in a pollution, grounding, collision or allision incident during the past 12 months? If yes, provide details: No
|
12.3 |
Date and place of last Port State Control inspection: |
Mar 01, 2024, Antwerpen |
12.4 |
Any outstanding deficiencies as reported by any Port State Control? If yes, provide details: |
No
|
12.5 |
Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:
*"Approvals" are not given by Oil Majors and ships are accepted for the voyage on a case by case basis. |
Contact owner for details. |
12.6 |
Date / place of last SIRE inspection: |
Aug 11, 2024 / ANTWERP, BELGIUM |
12.6.1 |
Date / place of last CDI inspection: |
Nov 05, 2024 / Amsterdam NL |
12.7 |
Additional information relating to features of the ship or operational characteristics: |
|